WED-800
Support
One Year
Double Shaft Shredder
Top Feed
Solid Knife Roller
Automatic
Control Cabinet
CE
Electric
Bark Wood Vegetable E Waste Plastic Drum
Alloy Steel
800*640mm
22kw
1.8tons
1-1.25tons/H
WELL-Atech
Wooden Case with Film
2500*1120*2230mm
China
8477800000
Product Description

Model | Motor Power(kW) | Shredding Chamber (mm) | Machine Size (mm) |
WED-450 | 5.5/7.5 | 450*350 | 1320*800*1800 |
WED-550 | 15/18.5 | 550*500 | 2240*1050*2020 |
WED-800 | 22 | 800*640 | 2500*1120*2230 |
WED-1000 | 30 | 1000*690 | 2510*1865*2550 |


+ Domestic Waste
+ Plastic Waste: Plastic bottles, plastic jugs, plastic buckets, plastic baskets, etc.
+ Electronic Waste: Old hard disk, PCB boards, keyboards, mice, mobile phones, CDs, etc.
+ Metal Waste: Iron filings, cans, paint buckets, thin metal materials, etc.
+ Medical Waste: Syringe waste, pharmaceutical waste, small medical devices, latex material waste, discarded masks
+ Paper Products: Used cartons, cardboard, newspapers, books, documents, brochures, wrapping paper, etc.
+ Industrial Waste: Old clothes, leather, textile scraps, carpet factory waste fabric, general industrial waste, etc.
















At the same time, we also actively participate in foreign environmental protection exhibitions, and constantly develop new markets and establish new cooperation.
We look forward to every customer's visit. Well, the environmental equipment manufacturer you can trust and work with.

We have reliable freight forwarder and we always carefully check the quality before each shipment,to ensure the products are qualified.
Good service is good business.
Welcome to choose us!
Good service is good business.
Welcome to choose us!


A:We are a manufacturer with our own factory in Wuhu City, Anhui Province, China. Welcome to take a visit!
Q:How to choose a shredder machine?
A:Our technical consulting services can help, recommend the most suitable machine and program according to your needs, capacity, site and other actual situation.
Q:How about the service?
A:We provide after-sales service, including on-site installation, commissioning equipment, guidance and training of operators etc. Make regular return visits to solve your equipment problems and optimize your equipment maintenance methods.
Q:How long is your delivery time?
A:Generally, it will be about 35-40 days after deposit, which also will affected by the actual situation of the project.
Q:Which trade terms is available?
A:FOB, CFR,CIF, EXW and other terms based on your needs.