Weight Indicator
18mths
200kn
200
Stainless Steel
Commercial
CE
Non-Customized
Weight Indicator
Energy & Mining
JX PETRO
Wooden Box
as customer required
Dongying
84314310
Product Description
JZ series weight indicator, dead line anchor, suitable for petroleum and geological exploration drilling rig, workover rig drilling or workover process instructions and record the drill hanging weight and WOB change, a display instrumenthelp the driller to master the rig, workover drilling or workover operating parameters and judgment drilling work status.
JZ series weight indicator by the deadline anchor, weight secondary table (weight indicator and recorder).The instruments work environment temperature:-40~50ºC.
Structural composition | Consist of a sensor, a gauge, a pipe line and the other accessory part |
Dead-line pull | Maximum 48000LBS(213.5kN) |
Accuracy | 2.0 % gauge (1.0 %) |
Working temperature | -20ºC~70ºC |
Pressure medium | CW-15 hydraulic oil |
System pressure | 100psi(0.69MPa) |
Deadline Model | Weight indicator Model | Max. Deadline Pulling Force (kN) | Qty of the line | Capacity (kN) | Output pressure sensor (MPa) | |
Vertical | JZG42 | JZ500 | 420 | 12 | 5040 | 6 |
10 | 4200 | |||||
JZG35 | JZ400 | 350 | 12 | 4200 | ||
10 | 3500 | |||||
JZG24 | JZ250 | 340 | 10 | 2880 | ||
8 | 2400 | |||||
JZG20 | JZ200 | 200 | 10 | 2000 | ||
8 | 1600 | |||||
JZG18A | JZ150A | 180 | 10 | 1800 | ||
8 | 1440 | |||||
6 | 1080 | |||||
JZG15A | JZ100A | 150 | 6 | 1200 | ||
4 | 900 | |||||
Horizontal | JZG41 | JZ500A | 410 | 12 | 4920 | 6.83 |
10 | 4100 | |||||
JZG34A | JZ400B | 340 | 12 | 4080 | 6 | |
10 | 3400 | |||||
JZG18 | JZ150 | 180 | 8 | 1440 | ||
6 | 1080 | |||||
JZG15 | JZ100 | 150 | 8 | 1200 | ||
6 | 900 | |||||
JZG10A | JZ40 | 100 | 6 | 600 | ||
4 | 400 | |||||
We can designed as your request. |







A: You can contact us by email about your order details, or place order on line.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T and Western Union are the most usual ways we are using.
3) What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr -epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4)How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
5)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.