ED Coating Line Automatic Motorcycle Auto Parts Electrophoretic Coating Line

Price $80000.00 Compare
Min Order 1 Set
Shipping From Hebei, China
Popularity 295 people viewed
Quantity
+-
 

Hebei Zhanyao Intelligent Equipment Technology Co., Ltd.

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
ZYS-096
Aerospace Industry, Appliance Industry, Automotive Industry, Construction Industry, Furniture Industry
Powder Coating
Diesel, electric, gas, LPG
2 Years
95%-98%
on-Site or Internet Technology Support
Car/ Motorcycle/ Electric Panel
Electrostatic Spraying Equipment
CE, ISO
ZHYAO
Metal Frame and Plastic Film
Customized
China
8424899990
Product Description
Control SystemSiemens PLCSpray Gun Gema/ Debelle/ ZHYAO
Booth materialPVC/ PPRecoveryCyclone+ Filters
Heating EnergyGas/LPG/Diesel/electricityReciprocatorDesign Matching
Method Type Manual/Semi auto/AutomaticUsageMore Than 10 Years
Pretreatment typeSpray/ Immersion/ Shot blastingOven Construction Material150mm Rock Wool

Product Description


 

Product Parameters

Certifications

Cooperative Client


Packaging & Shipping

 

After Sales Service

FAQ

1.Are you a trader or a factory?
We are manufacturer and exporter.
2.What should I provide if interested in your powder coating equipment ?
A.The material/size(max)/weight(max)of your workpiece.
B.How many of your daily output(one day=8hours,one month=30days)?
C.What heating power do you prefer: electric, gas, diesel or coal?
D.The size of your factory(length, width and height)?
3.How to ensure the quality of the equipment?
A,We have hundreds of patents and passed the IS9001:2018 quality management system certification.
B,The Technical Review Committee,  reasonably determines and divides the stages of design,  production, installation and commissioning, and formulates detailed progress plans for each stage,Strengthen the quality assurance system and quality protection measures of equipment manufacturing department. 
C,We manning quality inspectors specially to control the processing quality of product strictly.
4.How to install equipment after purchasing your equipment?
A,We will provide installation information and installation videos
B,Our engineers will guide the installation and run the equipment. 
C,After the debugging, will provide complete training and track customer device usage.
5.How is your company's after-sales service done?
A,Provide the list of consumables to assist customers in establishing a comprehensive equipment maintenance system.
B,After the equipment is delivered to the customer, our company will send professionals to track the customer equipment for 60 days.
C,If customer has a device failure in the process of using the device, our company will operate the device remotely through the computer network through the authorization given by the customer, and eliminate all equipment failure problems.
D,Any problems with the equipment, our company guarantees to give solutions within 12 hours.

Feel free to contact with us to get your design !

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA