GF
One Year
ISO, CE
Steel
Slab Formwork
30% Deposit,70% Should Be Paid Before Shipment
Q355b
GF
Green/Customized Color
8480600000
GF
Bundle
China
8480600000
Product Description
Panel - Prop early stripping Green Formwork System - Steel Formwork
There are 3 basic components in Green Formwork System:
1)Panel with plywood faced on top of a steel frame
2)Prop with early stripping mechanism

Model Number | Size(mm) | weight(kgs) |
MB1812 | 1800x1200 | 45 |
MB189 | 1800X900 | 39 |
MB186 | 1800X600 | 31 |
MB1512 | 1500X1200 | 41.4 |
MB159 | 1500X900 | 33.3 |
MB156 | 1500X600 | 25.8 |
MB1212 | 1200X1200 | 34 |
MB129 | 1200X900 | 28 |
MB126 | 1200X600 | 23 |
MB99 | 900X900 | 23 |
MB96 | 900X600 | 19 |
MB66 | 600X600 | 14.3 |
SAFE -The independent table with 6 directions moving restriction.It's a very stable system.
EFFICIENT - It includes only few components, set and removal are very simple. With early stripping mechanism,it can shorten the construction period and save your time.
REDUCED TOTAL COST - Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced.
MINIMUM OPERATORS - 3-4 workers in a team can quickly and easily set up and remove the panels.
Through the combination of panels,aux beams and bridge beam ,the system deals with complex slab structure by very simple way.












If you have projects in hand ,please do not hesitate to contact us.