EAF
CE, ISO
Horizontal
Industrial
Steel-Making Equipment
Steel Molding
Electric
Customized
New
Electric
Automatic
on-Line
1 Year
Type Test Report
IEC
High Tempereture Carbonizing Furnace
Slag Furnace
Furnace Top Charging Bin
Medium-Low Carbon Ferromanganese Refining Furnace
Titaniferrous Slag Furnace
Ferrosilicon Furnace and Dedusting System
High Carbon Ferrochrome Furnace
ville
Wooden Cases
IEC standard
China
8
Product Description
Production introduction:
Steel-making electric arc furnace consists of furnace body, tilting device, electrode lifting mechanism, furnace
cover,furnace cover lifting and rotary device,water cooling system,hydraulic system, EAF transformer, busbar
system,high voltage system,electrical automation system, etc.
Metallurgical equipments:
*electric arc furnace
*ladle refining furnace
*submerged arc furnace
Technical parameters:


Spare parts:
*water cooled furnace cover
*water cooled furnace wall
*compound wall burner system
*electrode conductive arm and electrode clamps
*water cooled cable
*scrap bucket
*hydraulic cylinder
*furnace
*Furnace shell and wall
Power distribution equipment for steel plant:
*Eaf&Lf elecrode regulator
*Furnace automation panel.
*HMI station&programming
*HV switch board
*L.V.control & power distribution panel.
*FC&SVC system

Workshop & Facility


Steel-making electric arc furnace consists of furnace body, tilting device, electrode lifting mechanism, furnace
cover,furnace cover lifting and rotary device,water cooling system,hydraulic system, EAF transformer, busbar
system,high voltage system,electrical automation system, etc.
Metallurgical equipments:
*electric arc furnace
*ladle refining furnace
*submerged arc furnace
Technical parameters:
Electric Arc Furnace | Nominal capacity | Transformer capacity | Furnace body size | Electrode diameter |
1.2T | 1250KVA | Φ 2400 | Φ 200 | |
1.5T | 1500KVA | Φ 2700 | Φ 200 | |
3.0T | 2000 KVA | Φ 3000 | Φ 250 | |
3.5T | 2200KVA | Φ 3300 | Φ 250 | |
5.0T | 3200KVA | Φ 3420 | Φ 300 | |
8.0T | 5000KVA | Φ 5200 | Φ 350 |


Spare parts:
*water cooled furnace cover
*water cooled furnace wall
*compound wall burner system
*electrode conductive arm and electrode clamps
*water cooled cable
*scrap bucket
*hydraulic cylinder
*furnace
*Furnace shell and wall
Power distribution equipment for steel plant:
*Eaf&Lf elecrode regulator
*Furnace automation panel.
*HMI station&programming
*HV switch board
*L.V.control & power distribution panel.
*FC&SVC system

Workshop & Facility

