Electric Car Power Supply Home AC 7kw Charging Station

Price $320.00 Compare
Min Order 1 Piece
Shipping From Zhejiang, China
Popularity 311 people viewed
Quantity
+-
 

Zhejiang Anfu New Energy Technology Co.,Ltd.

VIP   Audited Supplier 18 years
Profile Certified by SGS/BV
AF-AC-07-L-A-O-3/4/5/6-JS-P
Type1 Type2 GB/T
RFID Card
One Pile with One Charge
Private Use or Public Use
Wall Mounted
Normal Charge
100, 000 Hours
≤60dB
Forced Air Cooling
Level IP55
<2000m
5%~95% Non-Condensing Cream
Fast EV Charging Station
CE, ISO
24 Months
AMPPAL
Carton
340*240*110mm
China
Product Description
Products Description
Kayal Hot Sale DC EV Charging Station Chademo CCS 60kwKayal Hot Sale DC EV Charging Station Chademo CCS 60kw
product name
AC EV Charging Station
model
AF-AC-07-L-A-O-3/4/5/6-JS-P
Dimensions (mm)
340*240*110
Human-computer interaction
4.3 inch touch screen
AC power
220Vac±20% ; 50Hz±10% ; L+N+PE
Rated current
32A
Output Power
7KW
working environment
Altitude: ≤2000m; Temperature: -20ºC~+50ºC;
charging method
Swipe card, scan code
Networking method
2G, 4G, Wifi, applet
Operating model
Offline no billing, offline billing, online billing
Protective function
Overvoltage, undervoltage, overcurrent, short circuit, surge, leakage, etc.
Charging port
GB/T 20234.2-2015
Charging cable length
Standard 3.5 meters (optional)
Protection level
Ip54
Installation method
Wall-mounted or floor-mounted installation, corresponding accessories are required
 
Hot Products
Certifications
FAQ
What is your terms of payment?
A:online fast payment, T/T
Do you test all your chargers before shipping?
A: All major components are tested before assembly and each charger is fully tested before shipped
Can I order some samples? How long?
A: Yes, and usually 7-10 days to production and 7-10 days to express.
How long to fully charge a car?
A: To know how long to charge a car, you need to know the OBC(on board charger) power of the car, the car battery capacity, the charger power. The hours to fully charge a car =battery kw.h/obc or charger power the lower one. For e.g, the battery is 40kw.h, obc is 7kw, charger is 22kw, the 40/7=5.7hours. If the obc is 22kw, then 40/22=1.8hours.
Are you Trading Company or manufacturer?
A: We are professional EV charger manufacturer.
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA