Energy-Efficient Shredder Recycling Machine for Metal, Rubber, Plastic Pipes & Wooden Pallets

Price $5000.00 Compare
Min Order 1 Set
Shipping From Anhui, China
Popularity 501 people viewed
Quantity
+-
 

Maanshan Xinye Machinery Tool Co., Ltd.

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
600/800/1000/1200/1400/1600
Technical Support
3 Years
≥15 Years
CE, ISO
380V
Horizontal
XINYE
Standard Exported Package
600/800/1000/1200/1400/1600
China
8477800000
Product Description
Product Description


1.Dual motor+Dual reducer drive system, low speed, high torque and strong tearingability;
2.German high alloy steel cutting tools, wear-resistant and durable, long service life;
3.42CrMo high alloy steel spindle, high precision machining, good mechanical strengthand strong impact
resistance;
4.Fixed knives are set on both sides of the knife box to prevent material winding, which can be disassembled
independently and easy to maintain;
5.Self aligning roller bearing, 4-fold sealing,effective dustproof and waterproof;
6.PLC control system, current monitoring,overload protection, automatic reverserotation, protection of motor
and tool;
7.The equipment has long service life and low maintenance cost
Detailed Photos

 

Product Parameters
Model80010001200140016002000
Main shaft speed(rpm)12~3010~2510~2010~157~157~12
Shaft diameter(mm)Φ140Φ150Φ160Φ180Φ200Φ220
Blade thickness(mm)354040455050
Number of rotor blades(pcs)222530303040
Number of fixed blades(pcs)222530303040
Motor power(kw)2x18.5~2x372x22~2x372x37~2x552x45~2x752x55~2x902x75~2x130
Cutting chamber dimensions(mm)710x800830x1000830x1200830x14001000x16001000x2000
Overall dimensions(LxWxH)(mm)3250x1700x21003800x1800x25004200x1900x27504600x2250x28504950x2300x29005650x2400x3200



FAQ

Q:Are you a factory or a trade company?

A:We are a manufacturer with our own factory in Ma'anshan, Anhui Province, China. Welcome to take a visit!
 
Q:How to choose a shredder machine?
A:Our technical consulting services can help, recommend the most suitable machine and program according to your needs, capacity, site and other actual situation.
 
Q:How about the service?
A:We provide after-sales service, including on-site installation, commissioning equipment, guidance and training of operators etc. Make regular return visits to solve your equipment problems and optimize your equipment maintenance methods.
 
Q:How long is your delivery time?
A:Generally, it will be about 20-35 working days after deposit, which also will affected by the actual situation of the project.

Q:Which trade terms is available?
A:FOB, CFR,CIF, EXW and other terms based on your needs.
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA