Electrostatic Powder Coating for indoor and outdoor use
Mechanical property | ||
Testing items | Standards and methods | Inspecting index |
impact strength | GB/T1732-1993, AS3715 2.8 | >50kg/cm |
Bending resistance | GB/T1185-88, AS1580 402.1, ISO9227 | Pass 2-5 millimeters |
Adhesion CHECKED TEST | GB/T9286-88,2mm Cross cut, ISO2409 | Pass100/100, passes 0 levels |
Cup drawing: Erichsen, ISO1520 | Erichsen, ISO1520 | Pass 3-7 millimeters |
Pencil hardness | GB/T6739-86, Mitsubishi | Pass H-2H |
Chemical resistance and weather resistance | ||
Salt spray test | GB/T1771-91,500 hours | The cross section of corrosion less than 2MM |
Hot and damp resistance test | GB/T17740-79(89),1000 hours | Without air bubbles, loses the light slightly |
Acid resistance | 10% CH3COOH, 240 hours | Without air bubbles, the surface without damage |
Alkali resistance | 10% NaOH, 240 hours | Without air bubbles, the surface without damage |
Heat resistance | 200degree,1 hour | The color change is lower than E=1.5 |
Solvent resistance | MEK24 hours soaked in solvent-free | Without air bubbles, the surface without damage |
Uvioresistant | QUV-313,500 hours | Gloss higher than 80% lower than the Munsell color change level |
Water tolerance of | 2 hours | No bubble, not falling, losing light |
We are total solution provider, we also make the following powder coating machines:
2) Drying oven: Drying oven which drying the water after pre-treatment is designed according to customers' actual conditions.
3) Powder spraying system: Automatic spray reciprocator, manual spray equipment and Semi-auto (Auto-spraying with manual repairing spraying) are for your choice;
4) Powder recycling system: Cyclone equipment and cartridge filters is customized and introduced according to actual requirement by customer;
5) Curing oven: Tunnel curing oven, bridge type curing oven, Electric power heating curing oven, Gas-heating curing oven,High temperature, lower temperature curing oven is available for fitting your sole factory.
6) Conveying system: Various design according to different requirement by customer on the basis of customers' workpiece and output information.
7) Control system: PLC control, with or without touch screen
8) Spray gun and reciprocator
1. Pre-treatment system:

2.Spray Booth:

3. Drying/Curing Oven:


Our services:
1. Purchase Service Ours coating has a specialized and efficiency working team. If you are new on the coating, some pictures or drawings of your products and workshop could be show to us will be appreciated , we will give you specialized suggestion of whole work . |
2. Shipping Service Ours coating has a specialized and independent department which just for shipping the buyer's goods .The workers know T/T, L/C Items well. All Exported documents could be made perfectly . Our company cooperates with the most famous shipping company in China also. They could provide the best and economic shipping ways to the buyer's port. |
3. Installation Service Installation Services is available with all our machines. Ours coating will dispatches technician to the Buyer's factory to install and trial operate the equipment. |
4.Clients' Training Services Our Company can accept the buyer send their own technician to our factory to learn how to operate machines. Also, training in the installation period is better acceptable. |
5.After Sales Service We provide one year of warranty period. Many spare parts will be prepared in the tool box together with machines. |
Buyer Feedback:
We are professional in powder coating line project as customized. To provide you more details and quotation, would you pls let me know the following information:
1. What product do you need to paint? What's the material of the product?
2. What is the maximum size and weight for painted product? Would you pls send us some pictures of your product?
3. How many pieces will you paint in one hour or one day? How many working hours is it one day?
4. What is your available space for this powder coating line project?
5. What is the heating source?(gas,LPG,oil,electricity)
6. Do you need to change powder color frequently?
7. What is the powder curing condition (180-200'C in 15-20mins, or 200C in 10mins?)
8. What kind of pretreatment system do you use (spray pretreatment or dipping type)?
If you are interested in our products, don't hesitate to contact us, we will give you the most professional reply and support within a short time.