We are looking for the the partner all over the world at the same time, if you are the consumer, distributor or angency, please contact us. We look forward to working with you in the near future.



Product Characteristics
It' s mainly suitable for larger-caliber pipeline cracks DN200 or above and the working conditions in which the damaged points are longer and normal length repair device can not do. It' s also used as compensation connector when the pipe spacing is big in new pipeline laying works. It inherited the characteristics of ordinary dual-cassette repair device. Its repair length and endurance have improved. The installation is quick and efficient, lowering the costs for the enterprises.
Applications
larger caliber and long leakage repair in the fields such as shipping, oil field, chemical industry, metallurgy, water supply and drainage, factory, mines, fire-fighting, natural gas,, electric power, mechanical equipment etc.
Specification:
Models | Applicable Pipes Diameter | Products Length(mm) | Effective Repair Length(mm) | Bolt Torque(NM) | Bearing Pressure(MPA) |
DN150 | 159/168/170 | 500 | 420 | 80 | 2.8 |
DN200 | 200/219 | 500 | 420 | 80 | 2.5 |
DN250 | 250/273 | 500 | 420 | 100 | 2.5 |
DN300 | 315/325 | 500 | 400 | 100 | 2 |
DN350 | 355/377 | 500 | 400 | 100 | 1.8 |
DN400 | 400/406/426/429 | 500 | 400 | 120 | 1.4 |
DN450 | 480 | 500 | 400 | 120 | 1.4 |
DN500 | 500/508/530 | 500 | 360 | 120 | 1.2 |
DN550 | 560 | 500 | 360 | 120 | 1.2 |
DN600 | 609/635 | 500 | 360 | 150 | 1.2 |
DN700 | 710/720/738/762 | 500 | 360 | 150 | 1 |
DN800 | 813/820/842 | 500 | 340 | 150 | 1 |
DN900 | 915/920/945 | 500 | 340 | 150 | 0.8 |
DN1000 | 1016/1020/1048 | 500 | 340 | 160 | 0.8 |
DN1100 | 1120/1152 | 500 | 340 | 160 | 0.6 |
DN1200 | 1220/1226/1255 | 500 | 340 | 160 | 0.6 |
DN1300 | 1320 | 500 | 340 | 160 | 0.5 |
DN1400 | 1422/1462 | 500 | 340 | 160 | 0.5 |
FAQ
2, How to place an order?
3,What about sample orders?
Sea freight, China Express, and express shipping are available. Other shipping methods can also be arranged. Please contact us if you need another shipping route.
5,How long is the delivery production and shipping time?
The delivery time depends on the quantity of your order. It usually takes 3-30 working days.
6,Some products are missing from my package. What should I do?
Please contact our support team. We will verify your order contents with the packaging and compensate or reship accordingly. We apologize for the inconvenience.
7,How to confirm payment?
We accept wire transfers, PayPal, and other payment methods. Please contact us before making payment through other methods. Additionally, a deposit of 30% is acceptable, and the balance should be paid before shipment.