HL-brick
Free Replacement of Damaged Goods
30 Years
Customized
Semiautomatic
Hydraulic Shock
Concrete
Customizable
Brick Molding Machine
Easy to Operate
Provided
1500kg
380V/220V/Customized
Fly Ash Cement Sand
Hollow+Interlocking+Paver+Curbstone
50s
850*540*40
2-3 Person
Hrlynn
Standard Seaworthy Package
850*550*30mm
China
3301240000
Product Description


What is qt4-40 automatic aac sand block production line ?
The machine is a manual block production equipment which can produce hollow block, porous block, solid concrete brick etc. There is a vibrator on the upper mold and two vibrators on the lower mold. The exciting force in three different directions makes the block quality good. This kind of manual block making machine uses spring to cushion and pressurize, which reduces wear.




echnical parameter
Applicable Industries | Building Material Shops, Manufacturing Plant, Construction works , Other |
Type | Hollow Block Making Machine, Paving Block Making Machine, Interlock Block Making Machine, Curbstone Block Machine, Other |
Production Capacity (Pieces/8 hours) | Other, 4480 pcs/8hours, 2500 pcs/8hours, 3400 pcs/8hours, 1920 pcs/8hours, 5760 pcs/8hours, 1500 pcs/8hours, 1280 pcs/8hours, 3000 pcs/8hours, 12000 pcs/8hours, 3200 pcs/8hours, 2560 pcs/8hours, 1000 pcs/8hours, 800 pcs/8hours |
Voltage | 220V/380V |
Dimension(L*W*H) | 1200*1200*2200 |
Brick size | 400*100*200 mm, 400*120*200 mm, 200*100*60 mm, 300*150*100 mm, 400*150*200 mm, 240*115*90 mm, 200*200*60 mm, 150*150*100 mm, Other, 400*200*200 mm, 230*220*115 mm |
Warranty of core components | 10 Year |
Core Components | PLC, Pressure vessel, Other, Engine, Gear, Motor, Pump, Bearing, Gearbox |
Weight (KG) | 1500kg |
After-sales Service Provided | Online Support/Video |
Raw material | Flyash |
Keywords | Automatic Cement Block Moulding Machine |
Product Name | Automatic Concrete Making Machine |
Block Type | Hollow Concrete Brick Machine |
Pallet size | 900*620*35 |
Advantage | Multi Function Block Production Line |
Power | 8.55KW |
Application | Buliding Construction |
Molding cycle | 30-40s |



