Factory Manufacture Light Weight Aluminum Frame Formwork for Wall and Column Concrete

Price $120.00 Compare
Min Order 20 Pieces
Shipping From Jiangsu, China
Popularity 399 people viewed
Quantity
+-
 

YANCHENG LIANGGONG FORMWORK CO., LTD.

VIP   Audited Supplier 6 years
Profile Certified by SGS/BV
Aluminum Frame Formwork
Online Technical Support
1 Year
ISO
Aluminum
Wall/Column Formwork
LG-Af-120
6061-T6
60kN/Sqm
15mm
LIANGGONG
Container
Standard
China
7308400000
Product Description

Aluminum Frame Formwork

Aluminium Frame Formwork system consists of 6061-T6 aluminium alloy frame and 15 mm thickness plywood. The formwork system is mainly composed of panels, alignment couplers, tie rods, articulated corners, push-pull props, platform brackets, plate nuts and other components.
 

Product Application

Shear Walls: 
Shear walls are designed to counteract lateral loads, such as those from wind or earthquakes, that act on structures. The heaviest aluminium panel measures 300 cm × 100 cm and weighs 70.9 kg, which two workers can carry without the need for a crane. The LG-AF panel is a hand-held system formwork that allows for a pour height of up to 3 m in a single lift. This innovation simplifies the process of forming shear walls. With its range of sizes and ease of use, the LG-AF panel adds flexibility to site operations.
Elevator Shafts and Stairwells:
The precise dimensions of concrete achieved with LG-AF panels are important to make the latter installation of the elevator faster and smoother. The low weight of the panels allow for safe operations, avoiding the risky handling of heavy elements by crane within confined space. The LG-AF panel system is ideal for constructing stairwelis and elevator shafts.The lightweight design of the panels allows carpenters to easily install and dismantle the formwork, giving them the option to quickly repeat the same process throughout various floors of the building. The range of panels and accessories included in the system make it easy to
form cornersand wall intersections.
Foundations: 
Aluminium Frame Formwork (LG-AF-120) is the perfect formwork for strip footing, tie beams, pile caps and plinths. During the initial phases of a construction site, no crane is available. A hand-held system formwork is ideal to do the job quickly and safely without compromises on the quality and precision of the concrete. LG-AF-120 panel is the best choice for foundation engineering. Whether it's for strip footings, pile caps, or plinths, the panels will be up to the job. A whole series of accessories provides multiple ways to support and prop the panels. Easy interface with timbers also provides maximum flexibility on site.
Basements: 
A lightweight formwork provides evident advantages when pouring concrete for basements. Being able to work without a crane is an advantage in every early stage of a project, LG-AF-120 is indeed a good option for basement engineering.
Basement engineering often has no access to the crane, and must work with a truck crane, or by hand. LG-AF-120 panels can be easily handled in the narrow space allowed by the excavation, so that site safety is greatly improved.
 

Packaging & Shipping

Packing1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
 

Company Profile


Honors & Certifications

 

Customer Visit

Our Advantages

1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand. Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products. Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
 
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.

FAQ


Q1: Are you a factory or trading company?
We are a factory.
Q2: How to get a quotation?
You can send us your project structural drawing or the material list for a quotation. Our engineer team will give your formwork solution.
Q3: What is the payment term?
By T/T or L/C.
Q4: What is the lead time?
Generally, it takes 25-30 days according to the quantity.
Q5: What is the package method?
We have standard package such as steel pallets, ton bags etc. , which suits to container transportation.
Q6: Do you have any guarantee on the quality?
We guarantee the quality of different products. If necessary, you can arrange a third-party company to inspect the product quality in our factory.
Q7: Do you have on-site supervision service?
Yes, we have an on-site supervision service for most of our projects worldwide except for a few restriction regions.
Q8: What benefit can we get from LIANGGONG?
From LIANGGONG , you can get one stop service from design-manufacture-delivery- after sale service.
Q9: Are you looking for agent or distributor in our country?
Yes, we are looking for an agent or distributor worldwide based on a win-win relationship. 
Q10: How to purchase your formwork and scaffolding?
For any order you proceed with, LIANGGONG will follow the following steps.
Step 1. Confirm the order based on our proposal after technical & commercial communication - by the customer, LIANGGONG overseas sales team and technical team.
Step 2. Make the deposit - by the customer.
Step 3. Report on production schedule weekly until completion - by LIANGGONG customer team.
Step 4. Execute pre-shipment inspection - by the customer or the third-party inspection company.
Step 5. The balance payment - by the customer.
Step 6. Arrange the loading and shipment after balance payment - by LIANGGONG customer team.
Step 7. Submit the complete set of shipping documents via courier after departure - by LIANGGONG customer team.
Step 8. Submit the complete set of the user manual, calculation, shop drawing and assembly drawings - by LIANGGONG overseas sales team.
Step 9. Site supervision - by LIANGGONG on-site supervision team.

    
If you have another question, please feel free to contact us !
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA