Factory Price Concrete Construction Formwork Column Adjustable Plastic Square Column Formwork

Price $29.90 Compare
Min Order 1000 Pieces
Shipping From Hebei, China
Popularity 277 people viewed
Quantity
+-
 

Hebei Trico Trade Co., Ltd.

VIP   Audited Supplier 2 years
Profile Certified by SGS/BV
TR045
Yes
1 Year
SGS
PVC
Column Formwork
Concrete Formwork
Grey
60-100times
Yes
TRICO
Bundle
P60-P600 or Customized
China
39259000
Product Description
Product Description

Factory Price Concrete Construction Formwork Column Adjustable Plastic
Square Column Formwork


1.TRICO's new generation of square column formwork system adopts the traditional tenon and
   mortise design principle to form the assembly effect of the socket design, which can not only
   make the formwork bite more firmly, connect more closely, and ensure the angle. The most
   important thing is that it can be directly formed, eliminating the square column formwork
  correction process. It can greatly improve the construction efficiency and reduce the
  construction cost.

CommodityMaterialSpecificationSize(mm)
   
Modified PVC
P600600*1000/1500/2000/2500/3000
P450450*1000/1500/2000/2500/3000
P300 300*1000/1500/2000/2500/3000
P220 220*1000/1500/2000/2500/3000
P200 200*1000/1500/2000/2500/3000
P190 190*1000/1500/2000/2500/3000
P150 150*1000/1500/2000/2500/3000
P130 130*1000/1500/2000/2500/3000
P100 100*1000/1500/2000/2500/3000
p6060*1000/1500/2000/2500/3000
P50 50*1000/1500/2000/2500/3000
 Other Size Available


2.The column is poured with TRICO's square column formwork. It has beautiful lines,
    standard dimensions and smooth surface
.


3.Based on TRICO's patented formwork technology, the size of formwork can be arbitrarily
   increased horizontally or vertically, while ensuring the original pouring effect.

4.The three-layer stepped column formwork gradual change model built by TRICO's square
    column formwork is composed of 200mm, 300mm, 450mm and other different modules.
    Even 3000mm does not need through wall screws. It can handle a variety of scenes and
    modules,and can also be combined into high columns. It greatly reduces the demand for the
    total amount of templates, and through the scientific scheme issued by the mold matching
    design, each template can be reused to maximize the use of everything, thus saving the overall
    investment and achieving better results.

5. Pain point of traditional column formwork - formwork can only be cut, and more formwork
    is opened, more waste.


6.TRICO's Square Column Formwork System - Quick Formwork Erection and Simple Formwork
   Removal


7. TRICO's square column formwork can be used together with traditional formwork

8. TRICO's square column formwork is used together with square column buckle, and no through
    wall screw is required for oversized column diameter





Tested by the National Building Materials Testing Center, China Building Materials
 Inspection and Certification Group Co., Ltd. and other authoritative organizations,
the performance indicators are excellent.

More Product

Formwork Column Clamp  are quickly adjusted and secured to ensure positive clamping
of steel and timber formwork for Concrete Columns.They 
are designed to cramp the formwork
tightly together at the corners. It is very convenient during wall concrete formwork construction. 

 

Adjustable beam clamps are design only for beam formwork construction. It is appliable to
steel, aluminum, timber and even plastic column formwork. Each size of clamps cover have
cover up to 300mm size with every millimeter increment (eg: 200-400mm and 400-600mm)
By applying this accessories, it helps your worker to skip the works for tie rods and plastering
work after formwork strip off. Hence, the concrete beam has a better finishing, the timber panel
strip off without holes which means reusing time are more for the formwork panel. 

 

Our Services

TRICO offering the products:

  • Formwork Tie Rod System
  • Aluminium Formwork Wall Tie System
  • Scaffolding System
  • PP Hollow Plastic Formwork
  • Steel Formwork Panel with Plywood Forming System
  • Other Plastic Building Materials

1. Quality: Strictly control the quality through three levels. First level, quality test on the producing line.
Second level, quality test during warehousing. Third level, quality test before loading.

2. Timeliness: 24 hours online. Provide consulting and quotation services for customers all the time.

3. Veracity: Strictly follow the customer standard to ensure the tolerance range and meet customer's
requirement.

4. Integrity: If the customer complains about the quality of the products, our company will actively
cooperate with them to solve the problem. If it is the responsibility of our company, we will bear the
corresponding responsibility and compensation.

5. Longevity: Establish good long-term relationship with customers.

Company Profile

TRICO was founded in 2002. As an expert in the field of formwork and scaffolding,
TRICO is committed to providing better products and services to customers in the global
construction industry.

TRICO has a wide range of product lines, including the production and supply of full system
of building formwork, scaffolding and related components, and has realized the "1+N" one-stop
service mode. The products sell well in more than 90 countries and regions, winning the
recognition and trust of business partners around the world.

TRICO's R&D team is experimenting and optimizing products every day. The endless
improvement and perfection is the gene of TRICO culture. TRICO's mission is to promote the
quality improvement, cost reduction and environmental protection and efficiency enhancement
of global buildings.


Let's work together to make it easier to build houses anywhere in the world!

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA