Technology Parameters:
1.This laundry soap production line take soap noodles as raw materials.
2.The production starts with mixing soap noodles and perfume.
3.Then the mixed soap noodles enters in the three roller mill.
4.The soap thin sheet then converted into desired long strip soap by the plodder machine.
5.Then the long strip soap are cut into the soap bars required size by cutting machine
(there are two kinds of cutting machine. One is mechanical. The other is automatic).
6.Finally, the soap bars gets packed by packing machine if needed. 7.Soap bars can be made 60g,120g, 200g, 260g, and so on
Plodder head and shaping plate could be separated, easier to change shaping plate for different soap shape.
Cooling jacket is made to put cooling water to cool down the temperature of the extruding screw Heat the heat conducting oil or water to 45ºC~55ºC before
Motor On/Motor Off: motor power of the plodder Heat ON/Heat Off: turn on/off heat for heating part









1.DELIVERY LEAD TIME:
15-25 WORKING DAYS FOR THE MACHINE AFTER RECEIVED DEPOSIT
2.TERMS OF PAYMENT
BY 40% IN ANVANCED, THE BALANCE 60% BY T/T BEFORE SHIPMENT
3.PRICE VALID UNTIL
30 DAYS.
4.PACKING:WOODEN WITH STRONG SEAWORTHY PACKING SUITABLE FOR EXPORT
5.PORT OF SHIPMENT
GUANGZHOU PORT
Our Services
1.WARRANTY
THE SELLER WARRANTY THE MACHINE FOR ONE YEAR, AND SUPPLY ONE YEAR FREE SPARE PARTS WITH THE MACHINE.
2.TERMS FOR INSTALLATIONS,STARTING-UP AND ADJUSTMENT.
THE SELLER SHOULD SEND ENGINEERS TO CARRY OUT INSTALLATION AND DEBUGGING OF THE EQUIPMENT IN BUYER'S PLACE IF REQUESTED. THE COST FOR INTERNATIONAL DOUBLE WAYS AIR TICKETS SHALL BE PAID BY BUYER FOR THE ENGINEER. BUYER SHALL
COOPERATE WITH SUPPLIER'S ENGINEER AND MAKE ALL THE INSTALLATION CONDITION READY TO WORK. SUCH AS"WATER, ELECTRICITY,RAW MATERIAL ETC.
3.OPERATION MANUAL
THE OPERATION MANUL WILL BE SHIPPED WITH THE GOODS AND IN ENGLISH VERSION.