BIB bag Filling Machine Milk Yogurt Water Egg Liquid Juice BIB packing machine
Main Features
- 1, Packing standard: 1-inch sterile bag, 1-25 liters;
2, Filling capacity: 1-10 liters 250-300 bags/hour;
3, Filling accuracy: 10 liters ±0.5%;
4, Compressed air: 6~8bar 10NL/min;
5, Installed capacity: 0.5KW 220VAC 50HZ
Technical features:
- 1, The equipment adopts human-machine interface and PLC automatic control system, which is intuitive and convenient to operate, and has self-detection and protection functions;
- 2, During filling, the opening, filling and capping of the BIB bag are automatically completed according to specific procedures;
- 3, The E+H electromagnetic flowmeter system is used for quantitative filling and high filling accuracy;
- 4,It is suitable for filling 1-25 liter BIB bags. The filling weight can be set freely and the production is flexible . You only need to make the corresponding settings on the touch screen.
- 5, Reliable bag-clip design ensures smooth operation of the equipment without damaging the bag mouth;
- 6,Different filling fixtures are produced for BIB bags with different bag openings, and fixture replacement is simple and fast

8, The structure design is compact, and the components are basically imported brands, ensuring the reliability of the equipment.
9, Moving parts have detection feedback information, which is beneficial to quick troubleshooting;
10, The unique CIP cleaning design eliminates dead ends and meets the different CIP cleaning processes of various products. It is equipped with a CIP cleaning hose for cleaning the connection between the filling head and the CIP circuit;

Automatic cup dropping → quantitative filling → automatic film release → automatic sealing → output
model | BG-60-6 |
packaging speed | About 5,000 cups/hour (1 out of 6 cups) |
using electric | 380V/50HZ |
power | 1.2KW |
Use air pressure | 0.5MPa-0.75MPa |
Maximum air consumption | 0.45m3/m |
Dimensions | 300*120*178cm |
Machine weight | 1200KG |


Packing material: Combibloc
Filling Temperature: hot filling 85-88ºC
Overall power: 22KW (three phases of electricity)
Size: (L*W*H): 3.1*0.8*2.6m
Compressed air pressure: 1.0-1.4 Mpa, Flow rate: 0.8-1.0M3/min, without oil, water and dust
Cooling water:Flow volume:≥20L/ min Temperature: normal temperature



Related Products:



20Ton/Hour Milk, Yogurt Production Line Equipment
500L Milk or Yogurt production Line Equipment
Application:


Company Introduction:
Established in 2014 in Jiading District, Shanghai. We have our own production base,which located in Yangzhou City, Jiangsu Province. Our company is mainly engaged in the food, beverage, beer, condiments, pharmaceutical and chemical industries, and is responsible for the design, production and manufacturing of complete line equipment for fluid food turnkey projects. The main equipment includes pasteurizer, UHT sterilizer, Mixing Tank System, CIP systems, stainless steel tanks, Aseptic tanks, aging tanks, cheese Jar and Cooling tank, various types of individual equipment.


Exhibition:



Certification:



Shipment:
FAQ:
Q1: Do you have reference project?
A1: We have reference project in most countries,If we get the permission of the customer who has brought the machines from us ,we can tell you their contact imformation,you can go to vist their factory.
And you are always welcome to come to visit our company,and see the machine running in our factory,we can pick you up from the station near our city.
Contact our sales people you can get video of our reference running machine
Q2: Do you have after-service stations?
A2: our engineer can go to overseas for aftersales service
Q3: Do you provide customized service
A3: We can design the machines according your requirements(material ,power,filling type,the kinds of the bottles,and so on),at the same time we will give you our professional suggestion,as you know,we have been in this industry for many years.
Q4: What's your guarantee or the warranty of the quality if we buy your machines?
A4: We offer you high quality machines with 1 year guarantee and supply life-long technical support.
Q5: How long time for installation?
A5: According your machines order,we will send one or two engineers to your plant,it will take about 10 days to 25 days