Foundation Pile Breaker Hydraulic Machine Contruction Tools

Price $2000.00 Compare
Min Order 1 Piece
Shipping From Shandong, China
Popularity 499 people viewed
Quantity
+-
 

DEZHOU BTADRILLTOOLS INDUSTRIAL CO., LTD

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
4 modular
Parts Once Normal Damage
1 Year
Hydraulic Hammer
Hydraulic Pile Driver
Hydraulic Hammer
Electric
22kw
With Noise
New
New
According to Customer Piple Size
Instruction Manual
Good Price
High Quality
Free Fumiguation
180
Dezhou
Product Description
 4 module hydraulic pile breaker Product Introduction
 
Product Description

 

Product Overview
·High efficiency, fast speed, and labor saving in pile breaking
The hydraulic pile breaking machine provides pressure to multiple oil cylinders of the pile cutting machine through a power source. The oil cylinders directly drive the drill rod, while squeezing the pile body to cut off the pile head. During the construction process of the pile breaking machine, it is easy to operate, efficient, low noise, and cost-effective, suitable for pile group construction projects. The pile breaking machine adopts a highly modular combination, which is connected to modules through a pin shaft. By combining different numbers of modules, a certain range of diameter pile heads can be cut off.
Hydraulic pile breaking machine for cutting: such as cast-in-place piles, prefabricated piles, etc; From the shape of the pile cutting head, it can be divided into circular pile breaking machines and square pile breaking machines. Pile breaking machines are widely used in high-speed railway bridges and civil engineering pile foundation projects. Generally, circular pile cutting machines are suitable for pile diameters ranging from 250mm to 2500mm; The square pile cutter is suitable for pile edge lengths of 250-650mm and can meet the requirements of various large-scale foundation construction.
 
Detailed Photos

 

Product Parameters
Pile breaker parameter
Module quantitypcs4
 
89101112131415161718
Total weightKG160026242952328036083936426445924920524855765904
Pile breaker diametermm200-600600-800800-10001000-11501150-13001300-15001500-16501650-1800460-19701620-22002200-23602360-2500
Suitable weightT20T-30T30T-40THydraulic
Maximum pressure applied to the drill rod300KNMaximum pressure of a single oil cylinder20L/minTonnage of supporting construction machinery≥20t
hydraulic oil cylinder max travel300mmDrill rod diameter110mmSingle module weight328KG
hydraulic oil cylinder max press30MPaSingle pile breaking height≤500mmSingle module size885*780*340
 hydraulic station parameter
Motor power22KWPoles No4Motor speed1470 rpmMotor voltage3ph
380V
Pump rated displacement107L/mimNormal operating pressure of the system
Maximum operating pressure of the system30MPaflow45L/MPaOil box capacity400LElectromagnetic valve/control voltageAC220Vweight480KG25 MPa
Installation Instructions

 

 

1. Unscrew the oil injection port cover and transfer the hydraulic oil
Inject (ISOVG32, 46, 68 or equivalent hydraulic oil) and observe the oil level in the oil level gauge. The oil level should be submerged to the top mark of the oil level gauge. If the bottom mark of the oil level gauge is found during daily use, it indicates insufficient oil in the tank. Please add oil before use, otherwise it may cause system instability and pump damage. Insufficient oil damage is not guaranteed.

2. Unscrew the fixing screws on the side junction box of the motor, remove the cover, wire according to the wiring diagram shown on the motor nameplate, and ensure that the input voltage does not exceed the maximum allowable operating voltage of the motor.

3. Connect various hydraulic pipelines and electrical control circuits.

4. Start the motor, turn it off after about 1 second, and observe whether the motor rotation direction is consistent with the pump's indicated rotation direction. The motor is normally clockwise. If it is not consistent, please swap any 2 of the motor's 3-phase wires. If the motor is not in clockwise, please do not use it for a long time, which may cause the oil pump to burn out and is not covered by the warranty. (The motor does not rotate clockwise and the hydraulic station will not have pressure and cannot be used normally).

5. Start the motor again. The system can be used (when using it for the first time, please let the system run empty for a period of time to facilitate the elimination of air in the pipeline).

 

Attention issue

 


matters needing attention
It is necessary to follow the principle of breaking piles from top to bottom, and the height of the pile is determined by the concrete grade. It is recommended that the section of each pile should not exceed 40cm


1. During the process of pile breaking, it is prohibited to forcefully lift or pull the drill rod before it is fully retracted into the cylinder body. (The above picture shows the incorrect operation method, which can easily break the drill rod and guide flange.)

2. It is prohibited to use the pile breaking machine as a lifting plane to lift concrete blocks (the above picture is a serious incorrect operation method, as the pile breaking machine is prone to damage)
 


Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA