GBZD-600
1 Year
1
220V/380V
High
No
Single
Bag Making Machine
Computerized
Plastic Bag Making Machine
Made in Taiwan
Servo Motor
Made in Taiwan
Made in Taiwan
Piece by Piece
Two Air Cylinders
HDPE,LDPE
Engineers Available to Service Machinery Overseas
One Year
Two
SILSTAR
Wrapping Film Packing or Packed in Wooden Case
CE, ISO9001: 2008, SGS, TUV
Jiangyin City, Jiangsu Province, China
84778000
Product Description
Features:
This machine is special for production three or four folded flat and T-shirt bag. It is suitable for PE material etc. There are such features as photocell automatic tracking, blank/color bag-making shift, microcomputer length setting, automatic counting, automatic alarm when reach number, automatic temperature control and loading film by air cylinder.
Machine Brand: SILSTAR

Model | GBZD-600 |
Bag making width | 300-650mm |
Bag making length | 700-1200mm |
Bag making speed | 20-60 pcs/minute |
Bag making thickness | 0.012-0.10mm |
Main motor | 1.1kw |
Heating | 5kw |
Total power | 16kw |
Total weight | 1800kg |




Silstar machinery founded in 1997, covers an area of 32,000 m2,we focused on film blowing machine, bag making machines for plastic bag, and compostable bag. We have obtained 2 invention patents on garbage bag making machine and labeling machine, and 13 utility model patents, which has become one of the leading companies in this industry. By now It has already got the CE certification, ISO9001 quality certification, and ISO45001 safety management certification.
SILSTAR workshop pictures:



1. Q: How long will your engineer reach our factory? A: Within 7-15 days after the machine arrives at your factory. |
2. Q: How many days will you finish installing? A: We will finish installation and training within 3-7 days. |
3. Q: What should we charge for your engineer? A: You should charge for the cost of our engineer's visa, round trip tickets, accommodation, and also their salary of 100USD one day per person. |
4. Q: How long is your machine's warranty period? A: All our machines have one year guarantee, starting from the finished installation. |
5. Q: How could we do after one year warranty period? A: We also can do service for you, but you need to pay the salary for my technician 100USD/day. |
6. Q: How could we do if the parts are broken within the warranty? A: We would express the free replacement parts during the warranty date. |
7. Q: Does your engineer understand English? A: Our engineer understands a little English. All of our engineers have more than five years machine installation experience. |
8. Q: How many workers do we need to run those machines? A: Usually need one person to operate the machine. |
9. Q: How do we solve the machine problem after your engineer leaves? A: Generally speaking, there will be no problem after finishing the installation. In case you have any problem. You can contact our sales at any time. Our engineer will take a solution video according to your description. |
10. Q: How can I visit your company? A: It takes 30 minutes by train from Shanghai to our factory. |