Four Shuttle Plane Cam Circular Looms Weaving Machine

Price $6200.00 Compare
Min Order 1 Set
Shipping From Zhejiang, China
Popularity 231 people viewed
Quantity
+-
 

Wenzhou Zhuding Machine Co., Ltd.

VIP   Audited Supplier 13 years
Profile Certified by SGS/BV
ZD-PC-4/750
Automation
Support
4
300-750
512
40-60 R/Min
2.7kw
Flexible
Comprehensive
ISO, CE
Flow Production Line
Product Line
Support
zhuding
Film Packing
2000KG
Zhejiang, Wenzhou
Product Description

wenzhou zhuding machine co ltd making Small cam and connecting rod rolling wheel transmission,

which is the most advanced technology are adopted, making it easy and stable to run.
- Rolling transmission is adopted in entire structrue instead of slide block and slide rod, which does not need

  lubricant and decreases the wearing part.
- It's an environmental product whose noise is not more than 82dB(A).
- Low strength plastic yarn which is made from 100% regenerated plastic can be adopted to weave.
- It is high-efficient and energy economical. The highest rotation speed of the main motor can reach 180r/min
and the power is 1.5/2.2kw, which can save 10 thousand degree of electricity one year.

- It is the latest type circular loom

Main Technical Parameters:

Type\Item

Number of shuttle

Lay-flat width(mm)
40 warps/100mm

Warp max.(pcs)

Rotational speed (r/min)


Gross power of motor

Capacity (m/min)40 wefts/100mm

Installing Dimensions
(L×W×H)(mm)

Weight
(kg)

 

Marks

ZD-PC-4/750

4

350-750

768

140-180

1.5/2.2

1.4-1.8

8300×2200×2730

2000

save energy

FAQ
1. Q:How long will your engineer reach our factory?
A:Within one week after everything ready (machine arrival your factory, non woven material, power source, air compressor etc.Prepared)

2. Q:How many days will you finish installing ?
A:We will finish installation and training within 15 days.

3. Q:What should we charge for your engineer?
A:You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.

4. Q:How long is your machine's warranty period?
A: All our machine have half a years guarantee for electricity parts and one years guarantee for mechanism, starting from finished installation.

5. Q:How could you do if the parts broken within warranty?
A: We would express the free replacement parts during the warranty date.

6. Q:How could you do after one year warranty period?
A:We also can do service for you, but you need pay salary for our technicians 80USD/day for each person.

7. Q:Does your engineer understand English?
A:Our engineers understand a little English. All our engineers have more than five years machine installation experience.

8. Q:Can you help us find any engineer in our location?
A:Of course, we will check and inform you as soon as possible.

9. Q:How do we solve the machine problem after your engineer leaving?
A:Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time. Our engineers will take a solution video according your description.












Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA