Full-Automatic Roll Paper Packing Machine

Price Negotiable Compare
Min Order 1 Set
Shipping From Fujian, China
Popularity 387 people viewed
Quantity
+-
 

Quanzhou Huaxun Machinery Making Co., Ltd.

VIP   Audited Supplier 18 years
Profile Certified by SGS/BV
HX-30-A
1 Year
CE
New
Automatic
Full-Embossing
Without Core
Packaging
Huaxun
Wooden Pallet
China
Product Description
Model  HX-30-A Full automatic Toilet Rolls Packaging Machine
The packaging machine contains the conveying belt which is from automatic band saw cutting machine to packing machine.
 
Production speed 10-15bags/min
 size of roll  Toilet paper Packing size 2roll:length 93mm,width 220-240mm
Kitchen towel packing size: 2roll, length280mm, width 220-240mm
  • Operation height
750mm,adjustable
Packaging way 2rolls,4rolls,6rolls,8rolls.As photo.
Packing film CPP,OPP,High pressure PE,PVC
Machine power 6Kw-220V-50Hz
Machine Weight about 2000kg (approximately)
Automatic  with automatic material-feeding system
FAQ

1.How to start an order with us ?

1. Inquiry -Email Wechat/whatapp replying within 12 hours.
2. Solution offer - Best quotation based on your product, production capacity ,invest plan ,budget ect.
3. Customized -Customized according your practical requirement.
4. Preparation before placing order -Share the machine space ,air ,power ,electric with you to ensure fit with your factory space.
5. Confirm the order -With the advanced payment for starting machine production .

2.How to check the quality of the machine you ordered and the guarantee ?

-Each part is marked with the source code of the supplier
1Quality control -Each part is marked with the source code of the supplier.
12 months Warranty,We would express the free replacement parts during the warranty date.(exclude wearing parts). The express cost of parts should be paid by the buyer. After one year, our company will carry on the tracking of technology and quality.
2. Delivery- Packing according to international shipping FOB.

3.How about the Installation and training when the machine arrive your factory ?

1. Installation -Engineer Schedule confirmed 7 days before machinery arrival ,7-10days for installation depend on the machine operation difficulty .
2. Training The seller will send technicians to the buyer's factory to install and adjust the machine. The seller is responsible for the round-trip air ticket wages, and the buyer pays the technicians' accommodation (board and lodging) and transportation (bus fare, etc.). (If the technician is required to go there for the second time, the cost shall be borne by the buyer). The buyer should prepare electricity, gas source, raw materials, etc. before the arrival of the technician.
3. Cost of Installation & Training :You should cover round-trip air ticket wages, and the buyer pays the technicians' accommodation (board and lodging) and transportation (bus fare, etc.). You should prepare electricity, gas source, raw materials, etc. before the arrival of the technician..

4.How to build a long-term partnership between us ?

Feedback - Your sincere feedback is the most effective reference for the continuous improvement of our service.


Packing and shipping



Wooden pallet/ Plastic film/ Container





Shipping

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA