
1. Safe and environmentallyfriendly, easy to operate
2. Simple process, low cost
3. Short cycle time, low production efficiency
4. Can realise rapid small batch customization
5. High precision, not affected by complex shapes
CNC Machining or Not: | Not CNC Machining |
Material Capabilities: | Al, SS, Ti,CoCr,18Ni300 |
Place of Origin: | Jiangsu China |
Model Number: | slm 3d printing service |
Drawing Formats: | 3D(STL/STEP) |




1. What is the electrical configuration to install to power the machine, socket, power supply, electrical safety
• 120 M
Voltage 220V the socket can change local standards
• water cooling
Voltage 220V
• powder collector
Link the printer for power supply
2. Slicer software
• price
$1500/Year,$7000/Life time
• who does the maintenance
Software company
• Cost of maintenance and update
The fee includes maintenance and updates.
3. Information on chrome cobalt and titanium powders
• Heat treatment process for framework and coping/full unit and long bridge
Different powder have different heat treatment powder temperatures.
It is only related to the materials and has no relation to the printed products.
• Different granulometry offered15-53μm
• Photo for marketing
• Packaging I must personalize
I do not recommend changing the manufacturer's name and logo
Because it involves a certificate.
4. Support disc chrome cobalt and titanium
• Thickness
20mm
• Fixing in the machine
Magnetic
• How many prints to recommend
Recommended printing times: over 200 times; grinding amount: remaining 8-9mm.
• How to surface after printing
Grinding bed, Hand Grinder
5. Photos and video of the technical parts of the machine
• Electrical compartment
• Laser compartment
• Filtration compartment
not available for now
6. Maintenance after photo and video printing
• Time for cleaning before reprinting
Cleaning time before reprinting: Clean the forming chamber for ten minutes.
• Annual maintenance
The permanent filter cartridge requires no maintenance and can print over 20,000 times.
• Cleaning the powder collector
Permanent filter element does not require cleaning.
• Water level of the water cooling
Add purified water above green.
7. Surveillance camera information
• Remote connection to PC and telephone
• Send a video so that I can check
8. Chrome printing times and quantity cobalt and titanium
• Framework
7-8
• Coping and full
80-90
9. how long is the training
• learn the slicer
• learn the machine software
• learn the machine start-up
• learn the post-processing
• learn the machine cleaning and collector
• learn the annual maintenance
About 3 days