Fully Automatic Turnkey Project Prismatic Energy Storage Module Pack Assembly Production Line for 24ppm

Price $2800000.00 Compare
Min Order 1 Set
Shipping From Guangdong, China
Popularity 311 people viewed
Quantity
+-
 

Shenzhen Bluesea Intelligent Manufacturing Technology Co., Ltd.

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
Bluesea
Multiple Varieties
Continuous
New
Automatic
Engineers Available to Service Machinery Overseas
Custom
Custom According to Customer Factory Area
24ppm
Bluesea
Container
Custom size
China
Product Description
Product Description

1.Whole Line Process

Product Parameters
No.Technical SpecificationTechnical ParameterRemark
1
Overall line dimensions
(Length mm* width mm* height mm)
134500*6400*3000For reference size, see factory layout
2
Appearance color of the whole line CustomPerform according to customer requirements
3
Applicable to cell type
Thickness * Width * Height (mm)
50.1*160*118.5Thickness 39 ~ 73mm; Width 145 ~ 180mm; Height 98 ~ 210mm
4
Primary optimum rate≥99.8%The first optimum rate of the aluminum bar welding process of the module
5
Equipment noise≤75db1m away from the device shell
6
Cell sortingInternal resistance range 300mΩ±0.5%rdg.±5dgt.
The maximum display is 310.00 mΩ
7Voltage range 20V±0.01%rdg.±3dgt.
Maximum display ±19.9999V
8
Production efficiency of the whole line24PPM(prototype cell)Device side efficiency
9
Equipment transfer rate≥98%Final subject to customer site
10
Product qualification rate≥99.8%Non-equipment exceptions are not counted
11
Power requirements220V,50~60Hz/380V,50~60HzThe total power of the entire line will be provided after the 3D parties confirm it
12
Air source requirementCompressed air pressure 0.5~0.7MPaCompressed air φ12; Nitrogen φ12;
 
No.Item.Technical Parameter
1Whole line efficiency
Equipment noise
≥24PPM
≥16PPM
3yield≤75dB
4Utilization ratePrimary pass rate≥99.8%
5DT Rate/ failure rate≥98%
6CMK≤2%
7Change requirementCMK ≥1.67
8Whole line efficiencyOne key change

2.Whole Line Equipment
NO.Equipment NameQuantityUnitsRemark
1Cell feeding1PCS 
2Cell scan code1PCS 
3OCV/ACR test1PCSIncludes NG elimination, feed
4Cell gluing1PCSReserve automatic gluing position
5Gluing test1PCSReserved station
6Module stack1PCSIncludes end plate & insulation sheet line
7Manual module strapping≥2PCSCompatible side panel mounting
8Polarity address&Laser
engraving
1PCS 
9Safety test1PCS 
10pole laser welding1PCS 
11CCS installation(Manual)1PCS 
12Laser welding1PCS 
13After welding clean1PCS 
14After welding  test1PCS 
15Placement of acquisition
board
1PCSReserved station
16Nickel plate welding1PCSReserved station
17NTC glue1PCSReserved station
18Module EOL test1PCS 
19The module is affixed with
heating sheet
1PCS 
20Automatic offline1PCSCompatible mode combination and union
21Box line1PCS 
22Box cleaning & inspection1PCS 
23Housing component
installation
1PCS 
24Battery box bar code paste1PCS 
25Module into the box2PCS 
26Module fixation2PCS 
27Harness connection2PCSIncludes 1 line side station
28Wiring harness alignment2PCSIncludes 1 line side station
29Battery box EOL test2PCS 
30Battery box DCR test1PCS 
31Gasket & top cover mounting2PCS 
32Case airtight test4PCS 
33Pack down1PCS 
34Battery box packing1PCS 
35High pressure box
production line
2PCS 
36Module &PACK rework area1PCS 
37Production line logistics system1PCSAGV+ Material Terminal station

2.1 Cell feeding
1.Manually push the pallet with the battery cell into the positioning mechanism for positioning, a total of 4 incoming storage positions, to achieve one standby and one use, two place the battery cell positioning foam area, car detection or the battery cell pallet in place, the six-axis robot automatically grasp the battery cell to the charging level of the battery cell, the robot palm with CCD vision system, anti-fall, anti-short circuit, insulation functions.

2.2 Cell Scan code
Cell scan code
2.3 OCV and DCR test
1.Complete the OCV, ACR test and polarity reversal of the battery cell, test the OK cell to transfer to the next station, and the NG cell to the NG station.

2.4 Module stack
1.The stack is automatically stacked by robots. After the pre-stacked battery cells are completed on the pre-stacked platform, the module robot will pick up the stacked modules and place them on the horizontal workbench, and stack them repeatedly until the module cells are stacked.
2.5 Module EOL test
1.According to the test process requirements, complete the EOL test, including the total voltage of the module, the total internal resistance, the total voltage resistance of the positive/negative opposite shell, the total positive/negative opposite shell insulation test.

2.6 Module offline
1.The crane gantry grab module is connected to PACK to process the segment line body and grab the heavy load of 200kg.

Use for
Company Profile


Our Advantages

After Sales Service

 

FAQ

Q1 :How to ensure the quality of your products?
A:We have a professional design and quality team, we have focused on the module PACK line for 9 years. The core members of the industry are from the battery industry.

Q2: What is your delivery time?
A : 30-60Days

Q3 :What if our team knows very little about the PACK line??
A : We will provide you with turnkey service and free training of your employees, and provide 1 year of paternity after delivery of the production line.

Q4:How to deal with the problem of equipment parts?
A : We will prepare a spare part for you before shipment, so that you can react quickly when the equipment needs to be replaced without affecting production.


Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA