ZTN-05346
High Temperature
GS, RoHS, CE, ISO9001
Water
Standard
External Thread
Hydraulic
Brass
Single Seater
0.03-1(MPa)
Cw617/57-3
Solar Water Heater Electric Water Heater
Solar Water Heater Electric Water Heater
Hpb59-1 Brass
Natural Color
0.5-5L/Min
Hotel, Home, Office, Bedroom
ZTN
Pallet and Carton
DN15, DN20, DN25
China
848180409
Product Description


Product Details:
Place Of Origin | Zhejiang, China (Mainland) |
Brand Name | ZTN |
Material | stainless steel / BRASS |
Working Medium | Water |
Type | Floor Heating Systems |
Size | 1/2 3/4 1 FROM 1WAYTO 10WAYS |
Supply Ability | 50000 Pieces per Month |
Product features:

Working pressure | 0.05Mpa - 1Mpa |
Ideal pressure | 0.1Mpa - 0.5Mpa, more than 0.5MPa to install a pressure reducing valve |
Standard pressure | dynamic pressure 0.3±0.02Mpa |
Cold water supply temperature | 4-29ºC, hot water supply temperature: 50-95ºC, the recommended normal use temperature is 60-70ºC |
Constant temperature outlet temperature range | 20-50ºC |
Set the safety button temperature | 38ºC |
Safety and anti-scalding | When cold water is accidentally lost, the flow of mixed water is rapidly reduced from closing |
Accurate temperature | First set the required temperature, within 5s after the water can reach your required temperature, the water temperature fluctuation within ±1ºC |







FAQ:Q1.Can I get free samples?
A: Yes,we can provide you the free sample, but you need to bear their own delivery costs.
Q2. Can I have a sample order for fittings?
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.
Q3. Are you a trading company or a manufacturer?
A: We are a manufacturer.
Q4. What is your payment term?
A:Normally T/T 50% in advance, balance to be paid before delivery.
Q5: What is your main market?
A:North America,Greenland,South America,Africa,Southeast Asia, Former Soviet Republics ,East Asia,and Europe.
Q6:What kind of trade terms can you do?
A:EX-WORKS,FOB,CFR,CIF,etc.
Q7. What about the lead time?
A:Sample needs 15 days, mass production time needs 45 days.