Galvanized Octagonal/Round Street Light/ Lighting Steel Pole/Hinged Pole/Utility Pole, Gr65, Q355, Q235

Price $150.00 Compare
Min Order 50 Pieces
Shipping From Zhejiang, China
Popularity 443 people viewed
Quantity
+-
 

Hangzhou Zhongwei Industries Co., Ltd.

VIP   Audited Supplier 7 years
Profile Certified by SGS/BV
OCT-001
LED Light
Warm White
Steel
>200W
AC
Highway, Square, Garden
IP65
ISO
110-380V
Q235
Yes
80um
20 Years
ZQ
Cloth
China
730890
Product Description
Since 2003 we started to work with Australian client, which considered as the most strict client for the pole quality. Now we are making round conical pole, octagonal tapered pole, flood lighting pole, hinged pole, base enlarged pole, impacted absorbing pole and so on for the clients. We were trained to have a good quality control on every procedure of prodcution, especially on seam welding and hand welding. We also selected good partners of supplier to make sure we have the best steel and galvanization for our clients. With so many years of experience, we are confident to produce all quality products for our clients.

Clients: INGAL, Valmont, Union metal, Sylvania and so on
Product Parameters
 
Height5M to 12M one piece
ApplicationRoad, street, stadium, Airport, seaport, ETC
ShapeOctagonal, Round conical, polygonal, square
Material of steel      (Bao steel)Q235 Yield strength: 235Mpa
Q345 Yield strength: 345Mpa
and SS400, SS490, GR65
Tolerance of dimension+- 2%
welding penetrationMin 70%
twist degrees< 4 degrees
thickness2.5 to 30MM
finishinghot dip galvanized inside and outside (20 years warranty)
Galvanization companyNingbo Yongfeng (best quality in China)
production procedureRew material test → Cuttingj →Molding or bending →Welidng (submerged arc)
→Dimension verify →Flange welding→Hole drilling →Calibration → 
Deburr→Galvanization or powder coating →Recalibration →
Thread →Packages
FAQ

1. Do you accept sample or small orders?
Yes, we would like to develop business with any potential clients

2. what is the delivery time for a regular order?
the lead time is about 35 days

3. Do I have to worry about the package of poles? Since it is hard to pack them.
No, We have solution for package of poles for standard or open top containers

4. what about the payment terms?
We accept T/T, L/C, D/P


Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA