Genuine Cummins Inline 7 Datalink Adapter Kit 5299899 for Industial Equipment Use 5572620 6395441 for Vehicle Use

Price $1800.00 Compare
Min Order 1 Piece
Shipping From Fujian, China
Popularity 270 people viewed
Quantity
+-
 

Fuzhou Wintpower Technology Co., Ltd

VIP   Audited Supplier 4 years
Profile Certified by SGS/BV
5299899
Car Type, Trailer Type, Marine, Land Use
Emergency Crew, Standby Unit, Common Units
AC Three Phase
Water Cooling
Fixed
Diesel Generator
1500rpm/1800rpm
50Hz/60Hz
by Shipping or by Airway
Brand New
ISO9001, ISO14001, CE
Cummins
Carton Packing
1.75kg
Us
9031809090
Product Description
Part name: INLINE 7 Datalink Adapter Kit
Part number: 5299899 
Note:  5299899 is for Industial Equipment Use and 5572620 (6395441) is  for Vehicle use.



 ΔFAQ
1.What's your power range of Generators?
Answer:  We can offer the range from 5kva~3000kva.
2.What's your delivery time?
Answer:  Generally,we can delivery in 15-35 days after confirmation of order.
3.What's your payment?
Answer: We can accept T/T 30% in advance, and the balance 70% shall be paid before shipment
or L/C at sight.  But based on some special project and special order,we can do something support on payment item.

4.What's your warranty?
One year or 1000 hours (according to whichever reach first) from Ex-Factory date 
5.What's your MOQ?
Answer:We accept power generator MOQ is 1 set .

WINTPOWER Service System
Customer-focused traditional service better and better service levels worldwide-network Service
Concepts:Ensure that customers at ease using for WINTPOWER Products Serving the customers, WINTPOWER gains trust .Work together with Customers During the service period, WINTPOWER do best firstly and protects customers' interests.
In case of failure to use the generator, WINTPOWER help customer until they know how to use
 

WINTPOWER Service Principles
Customer foremost and honesty as foundation. Serving the customers heart and soul at all levels 24 hours each day.


Δ Factory Inspection: the test items before delivery are mainly as follows:                                                           
1.Each gensets shall be put into commission and loading more than 1 hours totally. They are tested on idle
load, testing range 25% 50% 75% 100% 110% 75% 50% 25% 0%
2.The noise level is tested by requested
3.All of the meters on the control panel shall be tested
The appearance of the genset and all of the label and nameplate shall be checked
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA