Glass Plant / Glass Production Line (Turnkey Project)

Price $15000000.00 Compare
Min Order 1 Set
Shipping From Jiangsu, China
Popularity 356 people viewed
Quantity
+-
 

Suzhou CMT Engineering Company Limited

VIP   Audited Supplier 11 years
Profile Certified by SGS/BV
Whole machine line
New
Automatic
Engineers Available to Service Machinery Overseas
Flexible
Assembly
Automation
Intelligent Manufacturing
Flow Production Line
Product Line
SGS
L*W*H =120*20*10m;
L*W*H =80*6*6m
1000m2
2000m2.
50 Days
80 Days
90 Days
22 Days
CMT
SGS
Jiangsu Suzhou
Product Description
I. Main technical parameter:
1. Melt ability on the 1st: 40t/d
Fold into glass thickness is 5 mm, Daily output is 2600 m2
2. Product varieties: Colourless transparent glass;
3. Product specifications: Thickness range 2- 10mm;
4. The width of original board of glass: 2400mm;
5. Product quality: Accord with the national standard in the People's Republic of China;
6. Comprehensive yield: 80%
7. Unit utilization ratios: 97.5%

8. Melts the life-span of the kiln: 4

1. Raw materials (The qualified powder material enters the factory)
1.1 Conditions of quality of different raw materials


Note: The accurate requirement of different raw materials should be decided after the quality of the raw material is confirmed. 

2. Fuel: Natural gas:

3. Supply power:
3.1 Demands consist of two pieces of independent power, so as to ensure that supplies power incessantly.
3.2 That enters factory's voltage:10KV±5%, frequency 50Hz± 1%, supplies power steadily in succession.
3.3 Supply power in workshop:
Voltage 380V/220V±10%, frequency 50Hz.
3.4 The installed capacity of  factories of equipment invites :100KVA;
Calculate load in normal production: <60kwh. 


4. Pictures


 
SN.Project
1Raw materials workshop
2Production unites the workshop
2.1Melt the section
2.2Shaping section
2.3Section that anneal
2.4Cut and judge the section of the finished product
2.5Bits of broken glass system
3Affiliated facility
3.1Compress the air and stand
3.2Circulating water system
3.3Laboratory
4Support the distribution system
5System ofNatural gas
6Installation and cold adjustment (cold adjustment is about 120days)
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA