DCIP041
After-Sales Service
One Year
ISO 9001:2008, CE
PLC
Ultra-Fine Mill
Automatic
Engineer Oversea Service
30000-300000tons/Year
Natural Gas/Coal/Diesel
Good
DCI
Seaworthy Packing
ISO9001
China
84742090
Product Description
As professional manufacturer and supplier for building material production lines, we DCI mainly provide gypsum board production lines, gypsum powder production lines, and gypsum block production lines with different capacities according to client's requirements.
With our professional technical team, we can complete a series of work from design(mechanical and electrical), manufacture, supply, installation, commissioning to stabilized production,certainly we also provide the spare part supply service.
Till now, we've manufactured and supplied complete sets of machine lines to Russia, Oman, Uzbekistan,United Arab Emirates, Iran.
1. Gypsum powder quality standard: GB/T 9776-2008
Gypsum powder: 80-100mesh
The initial setting time: Shall not be less than 3 minutes,
The final setting time: Shall not be more than 30 minutes
2. Main Technology(Nature gypsum rock)
Gypsum mine - crushing - grinding - calcining - aging -finished products (plaster of paris)
3.Payment conditions:
30% (USD) prepaid by T/T as down payment;
70% by irrevocable L/C at sight
a).65% shall be paid against shipping documents at sight.
b).5% shall be paid against performance guarantee at sight.
What's more , Kunlun bank account available to make convenient for Iranian clients
Welcome to visit and enquiry us!




With our professional technical team, we can complete a series of work from design(mechanical and electrical), manufacture, supply, installation, commissioning to stabilized production,certainly we also provide the spare part supply service.
Till now, we've manufactured and supplied complete sets of machine lines to Russia, Oman, Uzbekistan,United Arab Emirates, Iran.
Controlling Part | Full Automatic |
Annual capacity | Customized (30, 000-300, 000 Tons Per Year) |
Calcining system | Ebullition furnace |
Rotary kiln | |
Fuel | Natural gas, diesel, coal, heavy oil |
Raw material | Natural Gypsum Rock Desulfurization Gypsum Phosphogypsum |
Finished powder usage | Gypsum board |
Plaster wall |
Gypsum powder: 80-100mesh
The initial setting time: Shall not be less than 3 minutes,
The final setting time: Shall not be more than 30 minutes
2. Main Technology(Nature gypsum rock)
Gypsum mine - crushing - grinding - calcining - aging -finished products (plaster of paris)
3.Payment conditions:
30% (USD) prepaid by T/T as down payment;
70% by irrevocable L/C at sight
a).65% shall be paid against shipping documents at sight.
b).5% shall be paid against performance guarantee at sight.
What's more , Kunlun bank account available to make convenient for Iranian clients
Welcome to visit and enquiry us!




