
Product Description |
Product name | Galvanized steel water tank |
Material composition | Q235 steel |
Product Size | 0.5*0.5m, 1*1m, 1*0.5m, etc |
Panel Thickness | 3mm,2.5mm,2mm,1.5mm, it is different according the size of the tank. |
Tank Volume | 0.125-1000m3 |
Connection way | Bolt link |
Eco-Friendly | Yes |
Application | Water storage |
Process technique | Moulding process |
Product show |

Water capacity varies from 0.125 cubic meter to 1000 cubic meters, height may reach as great as 5 meters.
Inflow, outflow tubes as well as return tube's diameter and place is decided by the designer, passages of at least 7000mm is needed around the tank.

Panel size: 1x1m, 1x0.5m, 0.5x0.5m;
Process technique: ramming craft;
Connection way: bolted connection;
Panel thickness: 3mm,2.5mm,2mm,1.5mm, it is different according the size of the tank;
Structure |

Features |
2. Anti-aging, no distorsion, no infiltration .
3. Easy to clean and conveniently to install and assemble.
4. It can storage not only hot water, but also cold water, and has a better shockproof and shock resistant ability.
Accessories |

Sealing material: Non-toxic P.V.C foam tape shall be used in between the joints
Covers:The tank cover shall be constructed from 1.2mm to 3.0mm of thickness stainless steel 304 material according to the requirement
Flanges :The sectional panels shall be pressed to double flanges at the angles of 45 degree and 90 degree to the face of the plate on four sides.
Reinforcement Method :All tanks are internally braced with angle stays to endure the rigidity of the tank when filled with the water. The Top panel is supported by top panel support, which shall be made of stainless steel grade 304 or 316 material according to requirement.

1.When you order should provide water tank size, take over the place, diameter size.
2.Water tank can be supporting supply.
3.Use water injection temperature for the 4-65 is advisable. Water injection temperature higher than the value can be put forward in order to separately solve.
4.Water tank inside and outside of the other welding not welding, prevent damage porcelain face.
5.Water tank to the ground under should with structure design personnel for approval shall prevail.
6.Water tank should be regularly cleaned, try to prevent water into the trash.
Application |

Packaging &Shipping |

>> Delivery: Within 15 days after the payment was received.
Related Products |

Company information |

We mainly produce potassium sulfate production equipment,FRP tank production equipment,FRP pultruded products(include FRP Square tube/Rectangular tube /Round tube /Rod / U channel / I beam / Flat / Angle /Decking panel /Plum blossom tube /Ladder carling/Ladder crossgirder ),FRP pipe, FRP tank,FRP septic tank,FRP water tank,FRP grating,Cooling tower,FRP scrubber,Cable tray,FRP cover,FRP flange,FRP rock bolt,FRP handrail and so on,Looking forward to your visit and communication!

FAQ |
1. Q: Are you Trading Company or Manufacturing Factory?
A: We are both manufacturer trading and company. We have our own factory for almost seven years, and we have better service of overseas customers. Welcome to send your inquiry!
2. Q: I am interested in your products, could I get sample for free?
A: We can supply a few pieces FREE samples if we have some in stock, and you only need to pay the freight cost by yourself. Welcome to send your inquiry for FREE samples!
A: 10-15days after receiving the deposit based on the MOQ. Normally, 30-35days to finish the order for a 20ft
container. Welcome to ask for the detailed delivery time according to your order quantity!
A: We have the quality control system ISO9001:2015, and it's been followed strictly. We also have the professional QC team, and each our package worker will be in charge of the final inspection according to the QC instruction beforepacking.
A: Basically, the payment terms are T/T, L/C at sight. Western Union, Alipay.
A: We accept all OEM orders,just contact us and give me your design,we will offer you a reasonable price ASAP.