High Density Disc Electroplating Tooling for Lead Frame

Price $10000.00 Compare
Min Order 1 Piece
Shipping From Guangdong, China
Popularity 352 people viewed
Quantity
+-
 

Dongguan Allmerit Technology Co., Ltd.

VIP   Audited Supplier 3 years
Profile Certified by SGS/BV
One Year Warranty, 24h*7 Telephone Remote Support
One Year Warranty, 24h*7 Telephone Remote Support
4m/Min-8m/Min
Peek/RTV
Ocean Shipping\Air Transport
Pdip, Plcc, Sop, Sot, Tssop, Soj. Ect
IC Lead Frame
Allmerit
Suitable for Sea Shipment Packing
Customized
Dongguan, Guangdong
Product Description

Product Description

 

        High Density Disc Electroplating Tooling for Lead Frame

        Tooling size: Ø260*(60-130),Ø480*(60-130)

        Delivery Time: Normal processing cycle is 7-10days

        Tooling accuracy:  ≥ ±0.1mm

        It is developed for the requirements of selective silver plating of multi-row and multi-unit lead frames, and solves the problem about the diffrence of  thickness is too big between the middle part and the edge part of the wide lead frame. 

 

ADVANTAGE

Products can be customized according to the situation of different dimension of drum diameter.

High precision of product plating area.

High electroplating efficiency.

Using PEEK material, acid, alkali resistance and high temperature resistance.

 

Certifications

Our Customers

Company Profile

 

FAQ

FAQ
Q:Are you manufacturer or trading company ?

A:We are a professional manufacturer of large-scale research and production of semiconductor wet process equipment. We have a professional research and development team and production and assembly workshop, which can ensure quality and after-sales service.

Q:What is the width of the equipment ?
A:The width of the equipment is about two meters.


Q:How long is the warranty ?

A:The warranty period of our equipment is one year. One-step service, professional engineers to follow up to solve the problem.

Q:What is the packaging of the equipment like? What is the delivery method?
A:
Standard export fumigation sign wooden box packing or delivery by land or sea.

Q:how to install and debug the equipment after its arrival ?
A:
After the equipment is issued, we will arrange a senior installation and debugging team to the your company to complete the installation,debugging,training,etc.,and assist your company in the early mass production.

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA