Honybee650
10years
650W,450W,800W
0~100%
Solar Power Optimizer
IP67
99.6%
Front Side Max. 5400PA, Rear Side Max. 2400PA
13A
588g
75VDC
915m/2.4G/PLC
FRANKEVER
Zhejiang
Product Description

Honeybee 400 Solar Power Optimizer Product Features
1. Module-level shutdown to shut off the source of string high voltage, completely reduce the risk of personal shock. 2. Default shutdown state to ensure the personal safety of installation and maintenance personnel.
3. PLC communication,no need additional communication cable and convenient for installation. 4. Safe and reliable,with function of output short circuit protection, no risk of high temperature for any component failure.
5. 25 years lifespan,perfectly matching solar modules.
Product Code | Honeybee 400 | Honeybee 650 | Honeybee 850 | |||
INPUT | ||||||
Max Input Power | 450W | 650W | 850W | |||
Max Input Voltage | 75VDC | 75VDC | 60VDC | |||
Operating Voltage Range | 12~75VDC | 12~75VDC | 14~60VDC | |||
MPPT Voltage Range | 12~70VDC | 12~75VDC | 14~60VDC | |||
ISC | 15A | 16A | 23A | |||
Max.Intput Current | 13A | 15A | 21A | |||
OUTPUT | ||||||
Max.Output Power | 450W | 650W | 850W | |||
Voltage Range | 0~75VDC | 0~75VDC | 0~60VDC | |||
Max.Output Current | 13A | 15A | 21A | |||
Max. Efficiency | 99.6% | 99.6% | 99.5% | |||
OTHERS | ||||||
Max. System Voltage | 1000VDC/1500VDC | |||||
Operating Temperature Range | -40~+85° | |||||
Relative Humidity | 0~100% | |||||
Ingress Protection | IP67 | IP68 | IP68 | |||
Protective Class | II | |||||
Communication | 915M/2.4G/PLC | |||||
INSTALLATION SPECIFICATION | ||||||
Size | 130.3x109.6x25mm | |||||
Weight | 588g | |||||
Connector(Input/Output) | Compatible with MC-4 | |||||
STANDARD/CERTIFICATION | ||||||
Safety | IEC/EN 62109-1:200 the Low Voltage Directive(2014/35/EU) | |||||
EMC | EN 61000-6-1:2007 EN 61000-6-3:2007/+A1:2011 EN 61000-6-2:2005 EN 61000-6-4:2007/+A1:2011 the EMC Directive(2014/30/EU) | |||||
Certification | CE |
PV Module Level Optimization & Monitoring Solution (Add-one Optimizer, Wireless Communication )

Case: 10KW PV Station: 26Pcs of 390W Solar Panel, 2 String
13Pcs 800W-1200W Solar Optimizer + 1 Piece of Beehive + 1 Piece of Swarm
13Pcs 800W-1200W Solar Optimizer + 1 Piece of Beehive + 1 Piece of Swarm
Step 1. Smart PV Diagram (Apidae) Step 2. Register Macid or Sunway Model

Step 3. Installation of optimizers or PV monitors Step 4. Installation of data acquisitoin unit

Step 5. Connection to Swarm and Beehive Step 6. Installation of data aggregation device

Step 7.Setup in data cloud cente Step 8. Appendix - Product Specification


Project installation

20MW PV Station in Hetian XinjiangChina

7MW Floating Project in Laos

50KW PV Station in Ibaraki, Japan
1.What are your advantages?
Factory Direct Sale,Professional Team,Duly Delivery Time,High Quality,Customization Service.
2.About sample
After price confirmed,you can require a sample for checking.We can provide samples to you,charge sample cost with shipping cost.It
will be ready for delivery in 3-7 days.
3.What about the lead time for mass production?
Honestly,it depends on the order quantity and the season you place the order.The lead time of MOQ1000pcs is about 30-35 days.
4.Do you accept customized design?
Yes,we have a professional team with rich experience in manufcturing,we can manufacture the products per your requirements.
5.What's the payment method?
T/T would be better with quick transfer and few bank fees. 30% in advance, the rest 70% is before delivery.
Factory Direct Sale,Professional Team,Duly Delivery Time,High Quality,Customization Service.
2.About sample
After price confirmed,you can require a sample for checking.We can provide samples to you,charge sample cost with shipping cost.It
will be ready for delivery in 3-7 days.
3.What about the lead time for mass production?
Honestly,it depends on the order quantity and the season you place the order.The lead time of MOQ1000pcs is about 30-35 days.
4.Do you accept customized design?
Yes,we have a professional team with rich experience in manufcturing,we can manufacture the products per your requirements.
5.What's the payment method?
T/T would be better with quick transfer and few bank fees. 30% in advance, the rest 70% is before delivery.