BCF
Without Remote Control
AC
Metal
Kitchen, Bathroom
Duct Fan
CCC, ROHS
Aluminum Die Casting
PA6 Plastic/Metal
Single Phase(External Rotor)
Maintenance Free Ball Bearing
F
IP44
50Hz
-30°ºC to +60°c
1.5kv1min
30000 Hr to 50000 Hr (Based on Diff. Operating Con
Cartons
China
8414500000
Product Description
Backward Curved Outer Rotor Centrifugal Fan is a classic product space saving, can realize the exchange of heat and air cooling system in variety of driving and transpose. DC brushless external rotor fan can be customized according to customer's requirement.
Scope of application:
1. FFU system, ultra clean dustemoval, air conditioning unit.
2. Ventilation for building, workshop, ariculture, heating industry.




Specifications | ||||||||
Model | Voltage | Current | Power | Speed | Capacitor | Air Flow | Noise | Net Weight |
No. | (V) | (Amp) | (W) | (RPM) | (uF) | (CMH/CFM) | dB(A) | (Kg) |
BC-133 | 230 | 0.12 | 25 | 2750 | 2.5 | 220/129 | 51 | 1 |
BC-175 | 230 | 0.27 | 61 | 2430 | 2.5 | 385/227 | 64 | 1.25 |
BC-190 | 230 | 0.27 | 61 | 2290 | 2.5 | 495/293 | 66 | 1.4 |
BC-220 | 230 | 0.42 | 100 | 2480 | 3 | 810/478 | 70 | 25 |
BC-225 | 230 | 0.72 | 145 | 2640 | 6 | 1080/635 | 70 | 2.7 |
BC-250 | 230 | 0.81 | 190 | 2450 | 6 | 1150/743 | 71 | 3.5 |
BC-280 | 230 | 1.05 | 240 | 2480 | 8 | 1800/1060 | 79 | 3.8 |
BC-315 | 230 | 0.6 | 135 | 1400 | 3.5 | 1900/1117 | 63 | 5 |
BC-355 | 230 | 0.75 | 165 | 1400 | 6 | 2450/1441 | 63 | 6 |
Performancee Characteristics:
1. Optional design, dimension and air dealing specifucations.
2. Low noise & high efficiency Backward-curved impeller.
3. High efficiency & energy-saving design.
4. Mature technology, stable performance. 100% speed adjustment.
5. Low starting current.
1. Optional design, dimension and air dealing specifucations.
2. Low noise & high efficiency Backward-curved impeller.
3. High efficiency & energy-saving design.
4. Mature technology, stable performance. 100% speed adjustment.
5. Low starting current.

Reassuring Service
We control every step of your order to make sure the goods arrive your side with good situation on time without any worry.Strict testing for new products, OEM/ODM products, or customized products.
Our own molding factory (90T-1600T) provide us best cost, delivery time, quality for our Air Purifier, Anion generator, UV sterilizer, Fresh Air System, Exhaust Fan, Bathroom Fan, Heat Recovery Ventilator, Inline Duct Fan and so on.
Our own motor production line (two different department separated for different usage of motor.) provide us best cost, delivery time, quality for our own products.
Strictly required 5S workshop, regular staff training, in-process and final inspection, make sure every tiny mistake is stopped before delivery.
Specialized staff gives you an eye on your products. From our detailed loading report, you will know how are the products loaded. What you see will be what you received.



Q1. How to order? |
A1. Please send us inquiry → receive our quotation → negotiate details → confirm the sample → sign contract/deposit → mass production → cargo ready → balance/delivery → further cooperation. |
Q2: Do you have your own factory? |
A2:Yes,we have a factory, In Foshan, Guangdong Province |
Q3: How about the quality? |
A3: We have obtained certificate RoHS, CE, CCC to ensure products are high standard quality demand. |
Q4: How about your delivery time? |
A4: Generally, it will take 15-20 days after receiving your deposit. The specific delivery time depends on the items and the quantity of your order. |
Q5: What is minimum order? |
A5: The MOQ of our products is 200 pcs for one model one size. |
Q6.Do you make OEM? |
A6: Yes, we could provide OEM service, which including logo printing, gift box A carton box design, if you meet our MOQ. |
Q7. Do you test all your goods before delivery? |
A7: Yes, We have our own QC team and our products will strictly inspection before delivery |
Q8. How can I get a sample? |
A8: We provide the sample, if you are interested in our products, please contact us. |
Q9. What is your payment terms? |
A9. T/T, 30% deposit in advance, the balance should be paid before shipping. |