High Performance Polyester Nomex PPS P84 PTFE Fiberglass Filter Cloth for Dust Collector Filter:
Description:

Needle punched Polyester felts for filtration are exhibiting excellent performance under wet,acid,alkali and normal-temperature environments.
The melting temperature of Polyester is as high as 150oc.
Polyester Filter Bag Top:SS snapband.
Bottom:Reforcement 100mm or Disc.
Size:Customized.

Technical Specification:
Fibre | Polyester |
Scrim | Polyester |
Weight(G/M2) | 450~550 |
Thickness (mm) | 2.0 |
Width (mm) | ≤ 2.2 |
Length | 50m/roll |
Finish treatment | Singeing, Calendering,Oil&Water repellent Treatment. |
Air permeability (m3/m2/min): | 10.4 |
Tensile strength (N/5× 20cm) | Warp:>900 Weft:>1200 |
Tensile elongation (%): | Warp:<35 Weft:<50 |
Temperature (ºC): | Continue: 120 Instant: 150 |
Anti-acid | Good |
Anti-alkali | Good |
Anti-abrasion | Excellent |
Hydrolytic stability | Good |
Application | Mainly used in food and beverage industry,pharmaceutical industry,non-ferrous metallurgy,chemcial plant,building section and mining industry,power plant etc. |
Producing Process:
Install Diagram:
Applications:
More Production:
Packaging & Delivery:
Foreign Trade Team:



Exhibization:
Certificate:
Competitive Advantages:
1. 100% custom pass guaranteed.
2. Our products have been exported to Germany, Norway, Poland, Finland, Spain, UK, France, Russia, USA, Brazil, Mexico, Australia, Japan, Korea, Thailand, Indonesia, Uruguay and many other countries.
3. Flexible and Untraceable payment terms.
4. Good after-sale service.
5. We offer high quality products at competitive price in quick delivery
Shipping Details:
SHIPPING (Normally arrive port time in working days) | ||||
Destination | Express/Courier | SHIP BY SEA | SHIP BY AIR | SHIP BY EMS |
DHL/FEDEX/UPS/TNT | ||||
North America | 3~7 days | 15~24 days | 5~7 days | 10~12 days |
South America | 3~7 days | 15~25 days | 5~7 days | 10~12 days |
European Countries | 3~7 days | 20~30 days | 5~7 days | 10~12 days |
Africa Countries | 3~7 days | 40~50 days | 5~7 days | 10~12 days |
The Middle East | 3~7 days | 15~25 days | 5~7 days | 10~12 days |
Australia | 3~7 days | 10~15 days | 5~7 days | 10~12 days |