GN-S-ST650
Online Video After-Sales
1year
Coating Production Line
Coil Coating
Aluminum
CE
New
2000
Single Item
2000.000 Kg
Gearboxbearing,Gear,Pump,PLC,Engine
Fujian,China
380V
220V380V110V
Provided
Gaoneng
Wood
Provided
Mechanical
Automatic
Xxcm
MAOSEN
Wooden Case Parking
L 7430*W1030*H1980
Fujian. China
8420100090
Product Description


Introducing the Non-Standard Custom Double-Sided Coating Suspension Oven, a fully automatic coating machine designed to revolutionize your production line. This state-of-the-art equipment is engineered for businesses that demand high-quality finishes and unparalleled efficiency in their coating processes.
Customizable Design:
Tailor the oven to meet your specific production needs. Our non-standard design allows for adjustments in size, capacity, and functionality, ensuring that you get a machine that fits seamlessly into your existing workflow.
Double-Sided Coating Capability:
Maximize productivity with our innovative double-sided coating feature. This allows for simultaneous coating on both sides of your products, significantly reducing processing time and increasing output without compromising quality.
Fully Automatic Operation:
Experience the ease of automation with our fully integrated system. The machine is equipped with advanced sensors and controls that monitor and adjust the coating process in real-time, ensuring consistent results and minimizing human error.

Control System | Independently developed by GAONENG |
Human-Machine Interface | 10-inch touchscreen |
Coating Width | 460 mm (effective) |
Coating Method | Slot +Double Scraper (Arc Knife) |
Coating Thickness | 0.01-1 mm |
Coating Precision | ±3 microns |
Glue Tank Material | 304 stainless steel(bottom glue tank) |
Heating Tunnel Length | 3 meters (1 meter per section) |
Heating Tunnel Temperature | Ambient to 200 (constant temperature) |
Heating Method | Electric heating |
Roller Material | Aluminum alloy anodized |
Heating Tunnel Type | Suspension tunnel (customizable) |
Heating Tunnel Liner | 304 stainless steel |
Exhaust | Adjustable speed exhaust |
Tunnel Lifting | Dual-cylinder automatic lifting |
Tension Control | Automatic tension control |
Alignment Device | Automatic alignment during winding |
Winding Diameter | 500 mm |
Glue Supply System | Precision diaphragm pump |
Glue Container | 40-liter stainless steel drum |
Air Shaft | 3 inches (76 mm) |
Equipment Speed | 1-10 meters per minute |
Coating Method | Continuous coating |
Power Supply | 480V,60Hz |

Ideal for automotive, aerospace, and electronics manufacturers looking to enhance their coating processes for components and parts.
Furniture and Home Decor:
Perfect for businesses in the furniture industry that require high-quality finishes on both sides of their products, ensuring a polished look that appeals to consumers.
Custom Fabrication Shops:
A valuable asset for custom fabricators who need flexibility and precision in their coating applications, allowing for unique designs and finishes.



















1. Are your a trading company or factory? |
We are the source factory, specializing in the field of coating machines and printing machines. |
2. After an order is placed, when to deliver? |
We can ship within seven days after receiving the full payment. |
3.What about the warranty with after-sales services? |
We offer a one-year warranty. If any machine parts are damaged within one year (excluding human factors), we will provide replacement parts free of charge and offer online technical guidance. You only need to cover the shipping costs for the parts. |
4.What about the product's services and quality? |
Before shipment and delivery, we invite customers to our factory to conduct a 100% quality inspection and testing together with our engineers, as well as provide machine operation training. Each machine will also come with a video tutorial demonstrating how to install and operate it. Our machines have received widespread recognition and trust from our customers. |
5.Can your products be customized? |
Yes, our product can be customized according to your parameters. |
6.What are your payment terms |
The customer will pay 50% of the payment to initiate production. After the equipment is completed and passes the customer's inspection at our factory, the customer will pay the remaining 50% of the payment. We will pack and ship the equipment within 7 days after receiving the full payment. |
