High precision integrated circuit lead frame development equipment
Prodution speed: 3 m/min
The way of unlaod and offload: Roll to Roll
Width of the copper: Min 370 mm
Diameter of the coil: 350-450 mm Adjustable Maximum load- bearing capacity of 400 kg
Baseline thickness: 0.1 mm-0.5 mm
It is suitable for the development section before the frame is etched, and the IC frame graphics that need to be etched can be developed according to the graphics designed by the exposure film plate.

1. The developing line adopts a linear integrated structure, and the transmission bearing carries the copper material continuously.
2. Process groove cover used the tempered glass which has high transparency. With the corrosion resistant support rod, to easy to observe the situation in the groove.
3. The whole machine adopts a relatively closed environment design exhaust gas outlet, and the exhaust gas outlet is on both sides of each sub-slot, and the uniform extraction.
4. Three emergency stop switches are designed.
5. Development with swing system, with a conical nozzle (in the pool). The nozzle pressure maximum 2.5 kg can be adjusted by frequency conversion and ball valve respectively, the upper and lower pump pressure can be adjusted independently .
6. Tension sensor is installed at the winding place to ensure the winding is orderly, and the shaft is separated by mira film.
Frame | 316 Stainless steel |
Tank | SIMONA PP |
Pipeline | pp ball valve Use internationally renowned brands |
Motor | The turbo reduction motor uses a frequency converter to control the speedregulation |
Pump | Upright pump |
Electrical components | OMRON/LG/orsamerank brand |
Pneumatic components | SMC/AirTAC/or same rank brand |
Photoelectric sensor | Level control switch |
Heating tubes | Titanium |
PLC automatic control | Japan Omron /japan Mitsubishi |
Inverter | Japan Panasonic/or samerank brand |
High-pressure pump | ltalian Inte Plunger Pump |


FAQ
Q:Are you manufacturer or trading company ?
A:We are a professional manufacturer of large-scale research and production of semiconductor wet process equipment. We have a professional research and development team and production and assembly workshop, which can ensure quality and after-sales service.
Q:What is the width of the equipment ?
A:The width of the equipment is about two meters.
Q:How long is the warranty ?
A:The warranty period of our equipment is one year. One-step service, professional engineers to follow up to solve the problem.
Q:What is the packaging of the equipment like? What is the delivery method?
A:Standard export fumigation sign wooden box packing or delivery by land or sea.
Q:how to install and debug the equipment after its arrival ?
A:After the equipment is issued, we will arrange a senior installation and debugging team to the your company to complete the installation,debugging,training,etc.,and assist your company in the early mass production.