
The process and layout are available to adjust anytime according to your requirements.
In ZHYAO Technology All types of the conveying chains and rails are available here, we can design and choose the most suitable pattern for you.


To have a great anti-corrosion and beautiful coating, the process and pretreat formula is necessary.
Through 30 years' experience and our chemists, ZHYAO Technology has our own advanced technology to pretreat the workpiece, because of which, our production line can produce the stable and varieble coatings.
PLC controlled automatic powder coating machine is equipped for all the projects, which will largely save your labor and ensure the powder coating quality.
The recovery system of the powder are 2-step pattern. The powder utilization rate can reach 99.2%.


After all the manufacturing and inspecting of the related equipment, we pack them considering not only the container space, but also the installation situation.
All the departed device are convenient to assemble in your site and the strength won't be weakened. The well done project will run smoothly in 10 days after arrival.
The Standard Service Flow
The Standard Process Situation of the Powder Coating Line
Process | Parameter | Mode | Remark | |
Temperature | Time | |||
Loading | RT | |||
Pretreatment | 35-50ºC | 15-20min | Automatic | Adjustable |
Drying | 100-120ºC | 15-20min | Automatic | Adjustable |
Cooling | RT | 5-10min | ||
Powder Coating | RT | 3-5min | Automatic and Manual | Adjustable |
Curing | 200-220ºC | 30-35min | Automatic | Adjustable |
Cooling | RT | 10-15min | ||
Unloading | RT |



Are you a trader or a factory?
We are manufacturer and exporter.
Our own factory was found in 1995,Our export office was established in 2014.
What should I provide if interested in your powder coating equipment ?
A. The material/size(max)/weight(max)of your workpiece.
B. How many of your daily output(one day=8hours,one month=30days)?
C. What heating power do you prefer: electric, gas, diesel or coal?
D. The size of your factory(length, width and height)?
How to install equipment after purchasing your equipment?
A. We will provide installation information and installation videos
B. Our engineers will guide the installation and run the equipment.
C. After the debugging, will provide complete training and track customer device usage.
What's your production cycle like?
Because our company is doing non-standard custom coating production line, in order to ensure the quality of the product, the production cycle of the order equipment is 60 working days, and the actual situation needs to be arranged according to the company's recent order volume.
What is your terms of payment?
By T/T, 50% as deposit for production, and 50% balance before delivery. We'll show you the photos of the products and packages before you pay the balance. Other payment terms are as negotiated.