Formwork H20 Timber Beam, also called H20 Wood beam, I Joist, I beam, Wood H beam or Wood Girder, is widely used in formwork systems, construction systems parts, Falsework, systems, timber structures and other bearing structures .
Raw Material | New Zealand Radiate Pine LVL ,Solid Pine/Spruce,Poplar LVL,Plywood,3 ply board. | |||
Flange | 200/160mm(height)*80mm(width)*40mm(flange thickness) | |||
Length | 1.90, 2.45, 2.75, 2.90, 3.00, 3.30, 3.60, 3.90, 4.50, 4.90, 5.90 m, up to 12m ( any special length on clients' requent) | |||
Standard | EN13377:2002 & DIN V 20000-2 standard | |||
Moisture Content | <12% | |||
Density | 4.7-5.5kg/m | |||
End finish | red plastic wrap,waterproof paint,Metal cap. | |||
Surface finish | yellow painting,waterproof | |||
Usages | slab formwork system,vertical formwork(wall,column,hydraulic climbing,etc.), adjustable arced formwork etc. etc | |||
Packing | Pallets on the bottom,and Steel band for strength |
Product Description

Construction H20 Timber Beam
Introduction
Timber beam is an important part of formwork system, and has a very wide range of application in engineering.


Standard Specifications

End-to-end-joint
According to the need, standard holes can be drilled in the two ends of timber beam. We can lengthen the timber beam by end-to-end join. According to customers' demand, we can produce timer beams with any length.

Parameters
PARAMETERS | |
Model | timber beam H20 |
Width | 8 cm |
Height | 20 cm |
Length | 900mm~5900mm |
Flange | 40*80mm |
Web | 26mm |
Shear Capacity (broken loading) | 24KN |
Bending Bearing Moment | 11KN.M |
Raw Material
Raw material is spruce wood improted from Fenland.


Packing and Shipment

For 20' feet container: maximum loading capacity is 2260m
For 40' (GP) feet container: maximum loading capacity is 4600m
For 40' (HQ) feet container: maximum loading capacity is 5000m
FAQ
Q1. What do you do?
A: We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing, multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
Q2. How many construction projects have you accomplished?
A: 600 both in China and abroad.
Q3. Have you accomplished any landmark?
A: Yes, we have. For example, PAFC (660 meters tall), The 21 Century Building, 2008 Beijing the Nest Main Stadium, CCTV New Site, Colombo Lotus Tower(Sri Lanka), Hong Kong-Zhuhai-Macau Bridge, Gezhouba Pubugou Hydropower Station etc.
Q4. What can you do for us?
A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B.We sell our products to the contractors, building companies, or trading companies
C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D.We provide remote or on-site instruction to the builders.
Q5. What do you need in order to make a brief design and quotation when we have a construction project to be built?
A: Structural drawing and section drawing.
Q6. How long does it take to make a brief design and quotation after we offer the structural drawing?
A: In general, it takes 5~7 days based on specific requirements of construction project.
Q7. How long dose it take to manufacture the products after the signing of contract?
A: In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q8. Are your products available for leasing?
A: Our products are available for leasing in Indonesia, Singapore, Dubai, Australia, New Zealand. It depends on local relevant regulations in other countries.