High Quality Steel Auto Repair Tool Cabinet 211 PCS Tools Tool Trolley

Price $65.00 Compare
Min Order 50 Pieces
Shipping From Shanghai, China
Popularity 249 people viewed
Quantity
+-
 

Shanghai Weilin Information Technology Co., Ltd

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
OEM
Heavy
Workshop
Yes
SPCC
Tool Trolley
Storage Box
Powder Coating
4
Sheet Metal Fabrication
Yes
Support Customization
Multi-Size Drawer
OEM
Wooden Box
616*330*660
Cn
Product Description


Features for Tool Trolley 

Storage Space: The 4 Drawers Roller Tool Cabinet features seven drawers, providing ample space for  storing tools and equipment.

Lockable Drawers:The Four drawers are lockable, providing security for valuable tools and equipment.

Easy Assembly: The  4 Drawers Roller Tool Cabinet is easy to assemble, with all the necessary hardware and instructions included.

Smooth Rolling: The cabinet is equipped with four casters that allow for easy movement around the workshop. The two front casters are lockable, providing stability and security when the cabinet is stationary.

Customized Service:  The cabinet may not suit your requirements, but don't worry, please let us know your ideas or your designs, we can offer the engineer service and customized service.  
 

Product Description


High Quality Steel Auto Repair Tool Cabinet 211 Pcs Tools Tool Trolley

Toolbox overall size(without casters)616(W)x330(D)x550(H) mm
Toolbox overall size(with casters)616(W)x330(D)x660(H) mm
Package size650(W)x400(D)x700(H) mm
Material SPCC
Surface Powder Coating 
N.W.19.00Kgs
G.W.25.00Kgs
Drawers 4
 
Detailed Photos

 

Company Profile

Product Surface


 

Packaging & Shipping

FAQ

 

Q1: What is the MOQ?
 
A: MOQ depends on customers' needs, trial orders are also welcomed before mass-production.*

Q2: How long is the mass production? 

A: It varies depending on product dimension,technical requirements and quantities. Lead time usually needs 15-20days.

*Q3: How can we process the order?
 
A: After confirming the order,Proforma invoice and payment list for deposit will be sent to you accordingly . After receiving your deposit, production will be arranged accordingly at once and finish goods about 30-45days based on different quantities.

 

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA