FP-WA
Window Mounted Air Conditioners
18000-24000 BTU
Room
<23dB
CE
Level 1
Cooling/Heating
Electrical
AC
New
340-2380m3/H
2.1-12.6kw
2.6-26kw
34-238W
Less Than 50dba
10-50kgs
Steel
34-238wa
AIKE
Carton
50*50*30cm
China
Product Description

FP Series fan coil units consist of heating and cooling heat exchanger or coil and fan. It is only a small parts of HVAC systems used in residential, industrial and commercial buildings, and is used to control temperature in a specific space. The unit is controlled by a manual on/off switch, or a thermostat that controls the water flow to the heat exchanger by using a control valve or specific fan speed.

item | value |
Applicable Industries | Hotels |
Condition | New |
Type | air conditioning fan coil unit |
Place of Origin | China |
Shandong | |
Brand Name | AIKE |
Operating Voltage | 220V |
Mounting | vertical concealed |
Warranty | 1 Year |
Dimension(L*W*H) | / |
Key Selling Points | High-accuracy |
Airflow | / |
Machinery Test Report | Provided |
Video outgoing-inspection | Provided |
Warranty of core components | 1 Year |
Core Components | / |
Weight (KG) | 50KG |
Air flow | 340~2380m3/h |
Cooling capacity | 1800~12600W |
Heating capacity | 3330~23310W |
Input power | 39~246W |
Noise | 36~52dB(A) |
Fan | Forward multiblade centrifugal double sunction |
Motor voltage | 220V |
Heat exchanger | Hydrophilic aluminum foil fins |
Weight | 16~46KGS |
Certification | ce |






Fan coil unit |






1.Are you factory or trade company?
We are manufacture,with OEM service.
2.Are there any order requirements?
We will appreciate it a lot if you can offer us your product performance requirements and operation environment, so that we can
customize optimal production to meet your every requirement.
(1) Air volume
(2) Cooling/heating capacity
(3) Cooling/heating area
(4) Power and voltage
3.What are your Before-sale services
(1) Tell customers how to use our products and matters needing attention.
(2) Guide customers to choose the best and economic product, recover the investment within short time.
(3) Site inspection if you need.
4.What are your In-Sale services
(1)Quality control must be inspected strictly.
(2)In accordance with the agreements stipulated in the contract.
5.What are your After-sale services?
(1) If the project needs our installation guidance, we can send our engineer and translator. We can also send customers
installation video to teach them how to fix and operate with our product.
(2) Usually, our product warranty is 18 months after leaving factory or 12 months after installation for non-human factor
damages,within this months, all parts broken will be responsible for our factory.
(3) Regular contact with customer, consult with the customer feedback, come true with the customer's two-way communication.
6.How long is the delivery time?
Generally it is 1-7 working days if the goods are in stock. or it is 15-25 working days if the goods are not in stock, it is
according to quantity.
We are manufacture,with OEM service.
2.Are there any order requirements?
We will appreciate it a lot if you can offer us your product performance requirements and operation environment, so that we can
customize optimal production to meet your every requirement.
(1) Air volume
(2) Cooling/heating capacity
(3) Cooling/heating area
(4) Power and voltage
3.What are your Before-sale services
(1) Tell customers how to use our products and matters needing attention.
(2) Guide customers to choose the best and economic product, recover the investment within short time.
(3) Site inspection if you need.
4.What are your In-Sale services
(1)Quality control must be inspected strictly.
(2)In accordance with the agreements stipulated in the contract.
5.What are your After-sale services?
(1) If the project needs our installation guidance, we can send our engineer and translator. We can also send customers
installation video to teach them how to fix and operate with our product.
(2) Usually, our product warranty is 18 months after leaving factory or 12 months after installation for non-human factor
damages,within this months, all parts broken will be responsible for our factory.
(3) Regular contact with customer, consult with the customer feedback, come true with the customer's two-way communication.
6.How long is the delivery time?
Generally it is 1-7 working days if the goods are in stock. or it is 15-25 working days if the goods are not in stock, it is
according to quantity.