GBDR
Engineer Is Available for Oversea Service
1 Year
1 Line
1
220V/380V
Bottom Seal
High
Yes
Heat-Sealing Cold-Cutting
Single
Bag Forming Machine
Computerized
Plastic Bag Making Machine
Made in Taiwan
Made in Taiwan
Made in Taiwan
Engineers Available to Service Machinery Overseas
Chinese,English
Silstar
One Year
HDPE,LDPE
PLC ,Touch Screen
Two Air Cylinders
SILSTAR
Wrapping Film Packing or Packed in Wooden Case
CE, ISO9001: 2008, SGS, TUV
Made in China
84778000
Product Description

Silstar machinery founded in 1997, we focused on film blowing machine, bag making machines for plastic bag, and compostable bag. We have obtained 2 invention patents on garbage bag making machine and labeling machine, 13 utility model patents, which has become one of the leading companies in this industry. Our products including:
1.Plastic T-shirt Bag Making Machine
2.Vegetable Bag on Roll Making Machine With Core
3.Garbage Bag Making Machine Coreless
4.Draw Tape Garbage Bag on Roll Making Machine
5.Plastic Film Blowing Machine
There are more than 54 countries and regions cooperating with us, such as Malaysia, Russia, Iran, Saudi Arabia, Peru, Algeria, Vietnam, India, Romania, America, etc.
1.Plastic T-shirt Bag Making Machine
2.Vegetable Bag on Roll Making Machine With Core
3.Garbage Bag Making Machine Coreless
4.Draw Tape Garbage Bag on Roll Making Machine
5.Plastic Film Blowing Machine
There are more than 54 countries and regions cooperating with us, such as Malaysia, Russia, Iran, Saudi Arabia, Peru, Algeria, Vietnam, India, Romania, America, etc.
1. Main control panel adopts touch screen TECO from Taiwan, high definition
2. The drive system of the whole machine adopts PLC Microcomputer control (Single Chip control system ) on the punch machine which integrates control of bag making part and punching part.
3. Set all functions with one touch screen, simple and easy operation.
4. Machine will automatically stop if film jammed which is detected by the sensor
5. Independent winder part, high efficient unwind control; max diameter of single unwinding is 800mm; unwinding roller is choked by air shaft,
6. Automatic fold function
7. Automatic stacks the bag and collects.
2. The drive system of the whole machine adopts PLC Microcomputer control (Single Chip control system ) on the punch machine which integrates control of bag making part and punching part.
3. Set all functions with one touch screen, simple and easy operation.
4. Machine will automatically stop if film jammed which is detected by the sensor
5. Independent winder part, high efficient unwind control; max diameter of single unwinding is 800mm; unwinding roller is choked by air shaft,
6. Automatic fold function
7. Automatic stacks the bag and collects.

Bag Width | 1000 mm |
Bag Length | 1500 mm |
Film thickness | 10-50 µm per layer |
Unwinder Film Size | 1000mm x Φ 800mm |
Bag making Speed | 80-120 m/min |
Roll Change Speed | Max. 6 pcs |
Roll Width | 300 mm |
Roll Diameter | Φ 150 mm |
Total Power | 15 KW |
Air consumption | 5HP |
Machine Weight | 3800KG |
Machine Dimension | L9000*W2000*H2100 mm |




1. Q: How long will your engineer reach our factory? A: Within 7-15 days after the machine arrives at your factory. |
2. Q: How many days will you finish installing? A: We will finish installation and training within 3-7 days. |
3. Q: What should we charge for your engineer? A: You should charge for the cost of our engineer's visa, round trip tickets, accommodation, and also their salary of 100USD one day per person. |
4. Q: How long is your machine's warranty period? A: All our machines have one year guarantee, starting from the finished installation. |
5. Q: How could we do after one year warranty period? A: We also can do service for you, but you need to pay the salary for my technician 100USD/day. |
6. Q: How could we do if the parts are broken within the warranty? A: We would express the free replacement parts during the warranty date. |
7. Q: Does your engineer understand English? A: Our engineer understands a little English. All of our engineers have more than five years machine installation experience. |
8. Q: How many workers do we need to run those machines? A: Usually need one person to operate the machine. |
9. Q: How do we solve the machine problem after your engineer leaves? A: Generally speaking, there will be no problem after finishing the installation. In case you have any problem. You can contact our sales at any time. Our engineer will take a solution video according to your description. |
10. Q: How can I visit your company? A: It takes 30 minutes by train from Shanghai to our factory. |