High Speed Carton Paperboard Double Layer Conveyor and Hanger Stacker

Price $30000.00 Compare
Min Order 1 Piece
Shipping From Tianjin, China
Popularity 286 people viewed
Quantity
+-
 

Tianjin Zhono Import & Export Co., Ltd.

VIP   Audited Supplier 2 years
Profile Certified by SGS/BV
stacker
Engineer Guides, Debugs and Video Instruction
3 Years
New
ISO 9001:2008, GB/T19001-2008
Automatic
Recycled Material, Paper
Normal Specification Paper
1800mm
150m/S
3500mm
500mm
1700mm
Servo Motro with Drive
Pneumatic Move
Ding Hao
Film Wrapping, Wire Fixed, Oiled and Tray;
Up-Stacker
Dongguang County, Cangzhou City, Hebei, Chine
8441309000
Product Description
Detailed Photos

 

 


 
Product Parameters
Work Width(mm)1400-2500
Design Speed(m/min)150
Max. Stacking Height(mm)1400
Max. Stacking Length(mm)3500
 
Features
  • The corrugator stacker is designed with auto counting and auto stack change for stable and accurate switch.
  • The conveyor transmitting part is designed with pneumatic baffle, and the speed is controlled by the variable-frequency drive, allowing for stable and orderly stacking without sheet damage.
  • The stacking part features gantry design for lifting controlled by the variable frequency drive. When certain quantity is achieved during stacking, the sheet shall be auto shifted outside with variable-frequency drive control.
  • The baffle shall move backwards automatically during sheet output after stack shifting outside.
  • The size is electrically adjusted during shifting outside and the pneumatic brake is matched for walking.
  • Both sides at the output are equipped with paper stand, allowing for easy stacking and bundling.
 


Certifications
      FAQ

      1. Are you manufacturer or trading company?
      We a combination of manufacturer and trading company.

      2. What is the payment term you accept? 
      We usually accept T/T. DP and LC are also ok for us.
      We need 30% payment as deposit to arrange production and the balance should be paid before shipping.


      3. What is your leading time in average? How much time needs for installation?
      The manufacturing period for machine is 45 days since deposit is received and installation period is around 7 days.

      4. How do we install and debug machine?
      Engineer guides installation and debug machine via video or on site.

      5. Where is factory? How can we visit there?
      Factory is at Mianfang Road 36, Dongguang County, Cangzhou City, Hebei Province, China.
      It is near to Beijing and Tianjin, so after you get Beijing or Tianjin airport, we will pick you up to factory.

      Message Type
      * Message Content
      * Name  
      * Phone
      * Email
      * CAPTCHA