GF-CQTC
Yes
Negotiated
125 Tons
Q235B
2X7.5kw
6.7m
6m/Min
200mm-600mm
5.5kw
20MPa
Parameters May Be Adjusted for Specific Projects
Gaofeiqiaosui
Standard Packing
6.1m, 9.1m, 10.5m, 12.1m
Luoyang, Henan
8480600090
Product Description
Best Selling High-Speed Rail Tunnel Lining Formwork Trolley with Intelligent Information System
Intelligent information pouring lining trolley:
In order to solve the problem of key indicators in the construction process of traditional lining trolleys that cannot be fully digitized and displayed on screen, and to improve the quality of concrete operations completed by the trolleys, our company has launched a new generation of intelligent information pouring lining trolleys, which include: automatic pouring system for window by window pouring, temperature and humidity detection, pouring flow measurement, video monitoring system, arch pressure monitoring system, lap in place detection, pouring liquid level height detection Information cloud platform, intelligent vibration system, automatic track laying and walking system, anti hole warning system, visual sealing device, soft lap, etc. Through the above configurations, tunnel lining construction visualization, digitization, intelligence, and informatization are achieved, making construction easier, supervision simpler, and quality more reliable.
Product features
Reasonable structure
Advanced technology
Convenient installation
High strength
Good stability
High surface smoothness of lining
Fast lining speed
Reasonable structure
Advanced technology
Convenient installation
High strength
Good stability
High surface smoothness of lining
Fast lining speed

Intelligent information pouring lining trolley:
In order to solve the problem of key indicators in the construction process of traditional lining trolleys that cannot be fully digitized and displayed on screen, and to improve the quality of concrete operations completed by the trolleys, our company has launched a new generation of intelligent information pouring lining trolleys, which include: automatic pouring system for window by window pouring, temperature and humidity detection, pouring flow measurement, video monitoring system, arch pressure monitoring system, lap in place detection, pouring liquid level height detection Information cloud platform, intelligent vibration system, automatic track laying and walking system, anti hole warning system, visual sealing device, soft lap, etc. Through the above configurations, tunnel lining construction visualization, digitization, intelligence, and informatization are achieved, making construction easier, supervision simpler, and quality more reliable.
![]() | ![]() |
![]() | ![]() |
![]() | ![]() |
Product Parameter | |
Lining Length | 6.1M,9.1M,10.5M,12.1 M |
Material | Q235B |
Power | 2X7.5KW |
Tunner radius | 6.7M |
WALKING SPEED | 6M/MIN |
HYDRAULIC CYLINDER STROKE | 200MM-600MM |
HYDRAULIC MOTOR POWER | 5.5KW |
HYDRAULIC SYSTEM PRESSURE | 20MPA |
*PAMAMETES MAY BE ADJUSTED FOR SPECIFIC PROJECTS. |
Company Profile | |
About GAOFEI Luoyang Gaofei Bridges and Tunnels Machinery Co., LTD., was established in 2014, which located in Luoyang Industrial Park, Xigong District, Luoyang, is a modern enterprise specializing in the production of complete sets of bridge and tunnel equipment, integrating design, research and development, production, sales, installation and service. We focus on railway engineering (including passenger dedicated line), highway engineering, urban rail transit, water conservancy and hydropower engineering, municipal engineering and other construction projects of tunnels, Bridges and other aspects. Our main products include intelligent automatic pouring lining trolley, frameless lining trolley automatic waterproof board trolley, self-propelled invert trestle, gutter cable trough trolley, constant temperature and humidity spraying maintenance trolley, multi-functional arch mounting trolley, single line steering platform, various special-shaped formwork and shield tunneling machine. Nowadays we have more than 20 professional and senior technical personnel, more than 120 technical workers and after-sales service personnel, and more than 40 marketing and management personnel. After more than a decade of development and experiences, we have successfully completed many tunnel projects and our customers are well-known enterprises at home and abroad, throughout the country and overseas markets. Welcome friends to visit and discuss partnership prospects. | |
![]() | |
![]() |
Packing and shipping | |
![]() | |
![]() |
Company Qualifications | |
![]() |
FAQ | |
Q: 1.Q: Are you manufacturer or trader? A: We are professional manufacturer in Tunnel lining trolleys for more than 10 years. Q: How long is the design period? A: it normally takes 2-3days. Q: How often should mechanical equipment be maintained? A: The maintenance cycle for mechanical equipment depends on various factors, including the frequency of use, working environment, and manufacturer recommendations. Generally, it is recommended to follow the maintenance plan in the equipment manual and adjust according to actual usage. Q: How to ensure the safe operation of machinery equipment? A: To ensure the safe operation of machinery equipment, it is necessary to provide proper training for operators, ensure all safety precautions are in place, and conduct regular equipment inspections to prevent potential safety hazards. Q: How to optimize the energy consumption of machinery equipment? A: Optimizing the energy consumption of machinery equipment can be achieved through regular maintenance, using energy-saving modes, upgrading to more efficient equipment, and implementing energy monitoring systems. |