YL
Industrial
High Speed
Single-Phase
Driving
Closed Type
2/4
y-δ Starting
ISO9001, CCC
Julan
Blue/Green/Red/Black/White
Cast Iron
100% Copper Wire
JULAN
Carton
350*215*225
Taizhou City Zhejiang Province
8501400000
Product Description
Products Description
our Taizhou Julante Factory is Specialized in induction Motor Production

1)Frame 63-100:carton boxes
2)Frame 112-132:wooden boxes
Mounting ways:IMB3(foot mounting),IMB5(flange mounting),IMB35,IMB14.





our Taizhou Julante Factory is Specialized in induction Motor Production
We are a manufacturer but we can also supply the OEM service, products can be customized.


Inner packing
1)Frame 63-100:carton boxes
2)Frame 112-132:wooden boxes
Mounting ways:IMB3(foot mounting),IMB5(flange mounting),IMB35,IMB14.








OPERATION CONDITIONS:
- Duty: S1
- Frequency: 50HZ
- Rated voltage: 220V±5%
- Protection class: IP55
- Cooling method: IC0141
- Ambient temperature: -15°C≤0≤45°C
- Alititude should be lower than 1000 meters above sea level
OPERATION CONDITIONS:
- Duty: S1
- Frequency: 50HZ
- Rated voltage: 220V±5%
- Protection class: IP55
- Cooling method: IC0141
- Ambient temperature: -15°C≤0≤45°C
- Alititude should be lower than 1000 meters above sea level
China Julante Motors Factory Advantages:- Prompt Quotation.
- Competitive Price
- Guaranteed Quality
- Timely Delivery
- 100% Tested.
- Sincere and Professional Service.
- Outstanding Finishing Surface.
- Strictly and Perfect Management is guaranteed for Production.
- Specialized in Manufacturing and Supplying a wide range of Electric Motors since year 2002.
- Have Rich Experience and Strong ability to Develop New Products.
- Have Ability to Design the Products Based on Your Original Samples
Manufacturing process:- Stamping of lamination
- Rotor die-casting
- Winding and inserting - both manual and semi-automatically
- Vacuum varnishing
- Machining shaft, housing, end shields, etc…
- Rotor balancing
- Painting - both wet paint and powder coating
- Motor assembly
- Packing
- Inspecting spare parts every processing
- 100% test after each process and final test before packing

