High Voltage Tower Equipment Paint/ (Zinc 80%) Bridge Anti-Rust Paint/Epoxy Zinc Rich Primer

Price $4.90 Compare
Min Order 5000 kg
Shipping From Shandong, China
Popularity 309 people viewed
Quantity
+-
 

Shandong Haiheng Holding Group Co., Ltd.

VIP   Audited Supplier 2 years
Profile Certified by SGS/BV
Epoxy Zinc Rich-80.1
Zinc Gray (Non-Adjustable Color)
Liquid
Epoxy
Spray/Brush/Roll
Primer
Air Drying
ISO9001, ISO9000
Steel
Epoxy Resin + Zinc Powder, etc.
Conversion Type
80%
Hg/T3668-2009
4h (23ºC)
27ºC
a:B=10:1
20-30min (23ºC)
1year
23ºC, ≤30min
23ºC, ≤24h
23ºC, ≤7D
80±2ºC, 60min
23ºC, 6h
No Limit
Ayrood
Barrel
Main Paint 25KG + Curing Agent 2.5KG
Jining, Shandong, China
Product Description
 
High Voltage Tower Equipment Paint/(Zinc 80%) Bridge Anti-rust Paint/Epoxy Zinc Rich Primer

We use paint packaging cans imported from Germany, transport will be free for you to strengthen the packaging, to ensure that the product is transported to your hands is the most perfect state, and our packaging design is exquisite, excellent workmanship, the quality of the product itself is excellent, so the products are exported to dozens of countries and regions.
 
Design Usage

It is mainly used as a long-term anti-corrosive bottom coating for structure and steel products.

Design Feature

1. Fast drying at normal temperature;

2. Good adhesive;

3. Corrosion resistance;

4. Tough paint film; 

5. Easy to construct;

6. High zinc content, cathodic protection;

5. Excellent anti-rust performance.
 
Product Parameters
 
DensityAbout 2.30g/cm3
Volume solid50±3% (after mixing)
Theoretical dosage0.37kg/m2
Drying timeNatural drying (23ºC)Surface drying ≤ 30min
Actual drying ≤ 24h
Fully cured ≤7d
Stoving
(
work-piece surface temperature is 80±2ºC)
60min
Re-coating intervalMin interval time6h (23ºC)
Max interval timeno limit
Actual dosageSprayingabout 0.63kg/m2
Brushingabout 0.48kg/m2
 
Execution Conditions
1. Surface treatment:
Steel sandblasting to Sa2.5 level, or manual rust removal St3 level, surface roughness 40~70µm;

2. 
Temperature and humidity:
The substrate temperature is 0~50ºC, and must be
3ºC above the dew point, and the relative humidity is less than 85%.

 
Painting Method
 
Airless sprayingDiluentEpoxy Special Diluent
Nozzle Diameter0.4~0.5mm
Ejection pressure12~15MPa (about 120~150kg/cm2)
Air sprayingDiluentEpoxy Special Diluent
Nozzle Diameter2.0~3.0mm
Air pressure0.3~0.6MPa (about 3~6kg/cm2)
Roll coating or brush coatingGenerally not suitable for large area construction, limited to small area repair.
 
Company Profile

Packing
Certifications
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA