Horizontal Power and Free Overhead Conveyor I-Shaped Track Conveyor System

Price $19000.00 Compare
Min Order 1 Set
Shipping From Hebei, China
Popularity 279 people viewed
Quantity
+-
 

Hebei Zhanyao Intelligent Equipment Technology Co., Ltd.

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
ZYS61204
Hardware Spraying Equipment
1 Year
Tunnel Type, Walk-in Type, Mono-Cyclone Type
Bridge Type, Tunnel Type, Box Type
Gema, Wagoner, Zhyao
Gas, Electricit, Diesel
Electrostatic Spraying Equipment
Powder
CE, ISO
Automatic
New
Free Spare Parts, Field Installation, etc
Zhyao
Wooden Case
Customized
China
8424899990
Product Description
The process of Automatic powder coating line
No.Process NameProcess ParameterModeRemarks
TemperatureTime
1LoadingRT   
2Pre treatment35-50ºC15-20 minAutomaticAdjustable
3Drying Oven 100-120ºC15-20 minAutomaticAdjustable
4Cooling RT5-10 min  
5Powder coatingRT3-5minAutomatic and ManualAdjustable
6Curing200-220ºC30-35 minAutomatic Adjustable
7CoolingRT10-15 min  
8UnloadingRT   
 

1. This set of equipment is a comprehensive accumulation coating solution for long workpiece painting. It can automatically load and unload long workpieces, online accumulation and laying spray, translation and diagonal line supply. A typical case of automatic powder coating with reciprocators and spraying guns.

2. The pre-treatment takes advantage of the characteristics of the accumulation line and adopts the method of stopping spraying. This design can realize the process of using two bath liquids in one station shed for spray processing, effectively saving equipment costs and equipment Land occupied.

3. Some workpieces in the drying oven adopt the translation accumulation drying method, which improves the drying efficiency and greatly reduces the floor space of the drying oven and saves energy consumption. At the same time, long workpieces can be naturally transferred to the reverse process after translation






FAQ


1.Are you a trader or a factory?

We are manufacturer and exporter.
Our own factory was found in 1995,Our export office was established in 2014.

2.What should I provide if interested in your powder coating equipment ?

A.The material/size/weight of your workpiece.
B.How many of your daily output(one day=8hours,one month=30days)
C.What heating power do you prefer: electric, gas, diesel or coal
D.The size of your factory(length, width and height)

3.How to ensure the quality of the equipment?

A,We have hundreds of patents and passed the IS9001:2015 quality management system certification.
B,The Technical Review Committee,  reasonably determines and divides the stages of design,  production, installation and commissioning, and formulates detailed progress plans for each stage,Strengthen the quality assurance system and quality protection measures of equipment manufacturing department. 
C,We manning quality inspectors specially to control the processing quality of product strictly.

4.How to install equipment after purchasing your equipment?

A,We will provide installation information and installation videos
B,Our engineers will guide the installation and run the equipment. 
C,After the debugging, will provide complete training and track customer device usage.

5.How is your company's after-sales service done?

A,Provide the list of consumables to assist customers in establishing a comprehensive equipment maintenance system.
B,After the equipment is delivered to the customer, our company will send professionals to track the customer equipment for 60 days.
C,If customer has a device failure in the process of using the device, our company will operate the device remotely through the computer network through the authorization given by the customer, and eliminate all equipment failure problems.
D,Any problems with the equipment, our company guarantees to give solutions within 12 hours.


Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA