1.This laundry soap production line take soap noodles as raw materials.
2.The production starts with mixing soap noodles and perfume.
3.Then the mixed soap noodles enters in the three roller mill.
4.The soap thin sheet then converted into desired long strip soap by the plodder machine.
5.Then the long strip soap are cut into the soap bars required size by cutting machine
(there are two kinds of cutting machine.One is mechanical.The other is automatic).
6.Finally, the soap bars gets packed by packing machine if needed.
7.Soap bars can be made 60g,120g,200g,260g,and so on.
Name | 0-300KG per hour small cheap bar soap production line |
Raw material | soap noodle / oil |
Final product | toilet soap,bath soap,soap bar,laundry soap |
Processing capacity | 50KG/hour 100KG/hour 150KG/hour 200KG/hour |
Machine material | part in contact with the material stainless steel |
Soap packing | plastic bag / paper / box |

Mixing soap noodles and perfume---Miller---Transfer material to soap plodder machine
---soap plodder push long strip soap---Cutting and stamping logo- package

adjustable. This mixing tank can connect with miller by conveyor to realize automatic production.

Bar soap making machine miller with steel hopper, it is easy to put soap noodles and to clean.

The top parts also with exhaust fan.
Screw body with cooling jacket
Plodder head with heater device.

Small soap making machine shaping plate using 304 stainless steel, different shape as customer requirement.
Maximum output:75mm

Plodder with cutting
Plodder machine connect with cutting, it can automatic cutting and printing logo for square soap.
Hydralic stamping machine
This soap stamping machine can print logo or pattern on soap of different shapes
Stamp different size and shape of soap with changing mold.
1.DELIVERY LEAD TIME:
15-25 WORKING DAYS FOR THE MACHINE AFTER RECEIVED DEPOSIT
2.TERMS OF PAYMENT
BY 40% IN ANVANCED, THE BALANCE 60% BY T/T BEFORE SHIPMENT
3.PRICE VALID UNTIL
30 DAYS.
4.PACKING:WOODEN WITH STRONG SEAWORTHY PACKING SUITABLE FOR EXPORT
5.PORT OF SHIPMENT
GUANGZHOU PORT
Our Services
1.WARRANTY
THE SELLER WARRANTY THE MACHINE FOR ONE YEAR, AND SUPPLY ONE YEAR FREE SPARE PARTS WITH THE MACHINE.
2.TERMS FOR INSTALLATIONS,STARTING-UP AND ADJUSTMENT.
THE SELLER SHOULD SEND ENGINEERS TO CARRY OUT INSTALLATION AND DEBUGGING OF THE EQUIPMENT IN BUYER'S PLACE IF REQUESTED. THE COST FOR INTERNATIONAL DOUBLE WAYS AIR TICKETS SHALL BE PAID BY BUYER FOR THE ENGINEER. BUYER SHALL
COOPERATE WITH SUPPLIER'S ENGINEER AND MAKE ALL THE INSTALLATION CONDITION READY TO WORK. SUCH AS"WATER, ELECTRICITY,RAW MATERIAL ETC.
3.OPERATION MANUAL
THE OPERATION MANUL WILL BE SHIPPED WITH THE GOODS AND IN ENGLISH VERSION.