Hydraulic Power Steering Gear for Hino700 OE No. 44110-E0670 LHD

Price $262.90 Compare
Min Order 2 pieces
Shipping From Guangdong, China
Popularity 467 people viewed
Quantity
+-
 

Guangzhou Hongyu Precision Machinery Co., Ltd.

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
E13C 449-04193
-
1year
Power Steering Gear
Iron
ISO
Automatic
Standard
New
Hyjg
Neutral Packing
Original Size
High-Quality
Power Steering Gear Box/ Hydraulic Steering Gear
44110-E0670 Lh
Hino700
HYJG
Neutral & Customised
Standard
Guangdong, China
Product Description
Hydraulic Power Steering Gear for HINO700 OE NO.44110-E0670 LH
More than 1000 Steering Gearbox models for heavy duty includes overseas and domestic market
if you can not find your want here please talk with us directly. not all models be shown here
Product Description
OE NO.:
44110-E0670 LH
Type:
POWER STEERING GEAR
Front axle load:
8000kg
Work pressure:
13MPA
Suitable car:
For HINO
Flow rate:
18L/min
Suitable engine:
HINO700
Circles:
6.4
Place of Origin:
Guangzhou, CHINA
 
 
 
 
 
 
 
FAQ
1. who are we?
We are based in Guangdong, China, start from 2017,sell to Domestic Market(30.00%),North America(10.00%),Western Europe(10.00%). There are total about 201-300 people in our office.

2. how can we guarantee quality?
Always a pre-production sample before mass production;
Always final Inspection before shipment;

3. why should you buy from us not from other suppliers?
We are company major sales a variety of products model's power steering gear power steering pump and steering knuckle so on,you can be customized according to your specific needs.these products be for interested to you, please let us know.

4. What is your terms of packing?
Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.
 
5. What is your terms of payment?
Western UnionT/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
 
6. What is your terms of delivery?
EXW, FOB.
 
7. How about your delivery time?
Generally, it will take 5 to 10 days after receiving your advance payment.
 
8. Can you produce according to the samples?
Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA