ISO Cryogenic Storage Gas Tank

Price $58000.00 Compare
Min Order 10 Pieces
Shipping From Zhejiang, China
Popularity 496 people viewed
Quantity
+-
 

Ningbo DSW International Co., Ltd.

VIP   Audited Supplier 11 years
Profile Certified by SGS/BV
1DSW-TCC-50/2.4
Steel
Print
General Cylinder
Hydraulic
Standard, Nonstandard
Single-acting Cylinder
Common Cylinder
Number of Cylinders
Pressurized Cylinder
50000kg
3020mm*12660mm
Lco2
2.4MPa
DSW
Packed in Foam
TPED, EN, ISO9809
China
731100
Product Description
Material: Steel
Use: Industrial Gas tank
Pressure: High
Brand Name: DSW
LO2,LN2,LAR Cryogenic Tank (Vacuum Powder Heat Insulation) Specifications
.LO2 Cryogenic Tank, LN2 Cryogenic Tank, LAR Cryogenic Tank, 5M3 cryogenic tank, 10M3 cryogenic tank, 15M3 cryogenic tank, 20M3 cryogenic tank, 30M3 cryogenic tank, 5M3 VERTICAL CRYOGENIC LIQUID TANK, 1.6MPa cryogenic tank, CRYOGENIC LIQUID TANK, cryogenic Horizontal tank, Vacuum cryogenic tank, china produce cryogenic tank, liquid cryogenic tank, 20m3 Low Temperature Storage Tank Cryogenic Tank, Liquefied Natural Gas LNG/, 5m3-200m3 Cryogenic tank, LNG Natural Gas Cryogenic Storage Tank,5m3 Horizontal cryogenic tank,5m3 Horizontal cryogenic tank
CO2 gas cylinder
cryogenic tank container, 30m3 cryogenic tank container,15m3 cryogenic tank container
1. Norminal external diameter: 129mm
2. Norminal water capacity: 5-10Liter
.  QUOTATION FOR 20' LCO2 CONTAINER
-WORKING PRESSURE  2.4MPa

NO

NAME

PARAMETERS
1 Model1DSW-TCC-50/2.4
2 Total Volume50M3
3 Effective Volume48.5M3
4 Loading Medium Lox/Lin/Lar/LNG/LPG
5 Design CodeGB150(Chinese Standard)
6 Level GaugeChinese Maker
7 Main MaterialInner Vessel16MnDr
Outter Vessel16MnDr
8 Working TEMP.≥-40ºC
9 Working Pressure2.4 MPa
10 Design Pressure2.4 MPa
11Test Pressure2.4 MPa
12 static evaporation per day/
13 Corrosion Allowance0 mm1 mm
 
13
 
Welding Joint Coefficient
Class A1.00.85
Class B1.00.85
14 
Filling ratio
0.92
15
Insulating Type
High vacuum multilayer
16Total Net Weight12100 KG
17 Max Loading Weight21900KG
18 
Total Weight With Full Loading
 30138KG
19 Dimension12660*3020*2591 mm
   
20 Delivery time120 days
21 MOQ1 SET
22 Expire time30 days

About us:
Our company is one of main factory in China Chemical Equipment Group, and as well as the biggest pressure vessel manufacturer in Zhejiang. Sep. Established in 1972 years, We're engaged in design and manufacture pressure vessel for more than 40 years, and have the Design License of Special Equipment (Pressure vessels of type) (RSPZJHG0401-2), It has the following licenses issued by the State Administration of Quality Supervision, Inspection and Quarantine: A1, A2, B3, C2 and C3 pressure vessel manufacturing licenses; the design license for A1, A2, C2 and C3 pressure vessels; and the design license of GC1(3), GC2 and GC3 pressure piping
We have passed ISO9001:2008 International Quality Supervision System Certification.  We own 170000 square meter building size The total assets is 180 million, has 500 workers and staff members, including 55 technician (6 super- engineer, 19 engineer, 10 primary technician, 1 super-technician, 4 technician, 15 Nondestructive Tester (RT, UT). There're 8 departments, such as technology, production, sales, quality, purchase, finance, secretary and standard, 1general management office, 1 international export office (Ningbo DSW), 5 workshops and 1 Installation Company. Set up the Welding Test station with Ningbo Bureau of Quality and Technical Supervision. Quality Guarantee System charged by quality engineer, design engineer, welding.






Inspection guarantee:

The relevant welding seams will be subject to 100% RT non-destructive testing and penetrant testing (PT) according to the technological requirements of storage tank production. High-purity nitrogen (up to 99.999%) will be used to conduct the strength testing. Finally, advanced helium mass spectrometer leak detectors (with precision up to 2×10-9Pa.L/s) will be used to conduct Helium mass spectrometer leak detection. The inner containers of the storage tanks will be passivated by overall pickling to meet the cleanliness requirements for dangerous goods. Imported ultraviolet black light lamps will be used to make sure that there is no oil stain and other organic impurities in the inner containers. The inner and outer containers, after cleaning, will be assembled at a time interval less than 2.5 hours. After assembling, the inner containers and interlayers will be filled with nitrogen to protect them from dust and organic impurities, so as to ensure the cleanliness. The inner and outer surfaces of the outer containers will be subject to overall sandblasting treatment to meet the requirements of Sa-2.5 standard. When the surfaces of steel plates show the metallic color, a vacuum cleaner will be used to suck off the dust adhered to the surface so as to further ensure the vacuum degree in the interlayer. Special high-quality perlite is used as the insulation material in the interlayer. The perlite will be treated by using our company's special process before being in the interlayer. All the internal cylinders, after manufactured, will be subject to the gas-tight and pressure performance tests. Both the internal and outer cylinders will be subject to rigorous Helium mass spectrum leak detection. After the production is completed, all the pipe openings will be opened to carry out nitrogen purging and replacement, so as to meet the oxygen usage standard. After this, all the pipelines and valves will be sealed and the tanks will be filled with 0.2MPa high-purity nitrogen for protecting the tanks.





Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA