GW-5T-3500KW/0.5S
ISO
Vertical
Industrial
Crucible Melting Furnace
Steel Molding
Electric
Liuxingke Brand
Seaworthy Packaging
3500KW, 5Tons Capacity
China
8514200090
Product Description
Melting Capacity :5Tons
GW-5T-3500KW/0.5S induction furnace for melting Steel Scrap
The complete set of induction furnace components:
Converter Cabinet


Capacitor

Hydraulic pumping unit

Control board

Complete steel shell furnace body

Closed water cooled equipment

After sale service:
1.Quality Guarantee: 1 year.
2.Commissioning: We send technicians to the site to provide installation and commissioning services.
3.During the warranty period, provide accessories, free of charge .
4.After the warranty period, provide accessories in time and guide installation and commissioning
Trade terms
1. Delivery Port : Qingdao
2.Lead time: 30 days in low season, 60-90 days in peak season
3.Shipment: 20GP/40GP/40HC/40OT/Flat rack container,According to the situation
4.Payment terms:
4.1)By T/T, 50% in advance , 50% balance before shipment
4.2)By T/T + L/C , 50% by T/T in advance , 50% by 100% irrevocable L/C opened by famous Bank
4.3)By L/C , 100% Confirmed irrevocable L/C opened by famous Bank
GW-5T-3500KW/0.5S induction furnace for melting Steel Scrap
Sr. No. | Description | Rating |
1. | Rated Power (KW) | 3150 |
2. | Melting power (KW) | 3000 |
3. | Melting Temperature (°C) | 1650 |
4. | Melting time | 55±5 min |
5. | Input Power Factor | 0.95 |
6. | Input Voltage (Volts) | 800 |
7. | Output Frequency (Hz) | 500 |
8. | Output Voltage (Volts) | 3000 |
9. | Nominal capacity of furnace in Kg for Iron(kg) | 5000 |
10. | Maximum capacity of the furnace in Kg for Iron (kg) | 6000 |
11. | Melting Rate for Steel at 1650° C at 3000KW (Kg/Hr) | 5000 |
12. | Control method: Intelligent PLD power control system | Yes |
13. | Lining material: Acid or alkaline material | Yes |
14. | Energy consumption per ton for iron | 550KW.H±5% |
15. | Double rectifier transformer model | ZP-3150KVA/10KV/ 0.575KV *2 |
16. | Multi-protections: overcurrent, overpressure or underpressure, water pressure, phase loss, furnace leak alarm and water temperature alarm | Yes |
The complete set of induction furnace components:
Item | Product Name | Model | QTY | Unit | |
1 | MF Power Supply | KGPS series power supply | KGPS-CL-3500-0.5S | 1 | Set |
Coreless reactor | DK-3600 | 1 | Set | ||
Filter capacitor cabinet | KH-3600KW-LB | 1 | Set | ||
Resonant capacitor cabinet | KH-3600KW-XZ | 1 | Set | ||
Connecting copper bar | T2 (power supply to capacitor cabinet) | 1 | Set | ||
2 | Furnace body (steel shell with yoke) | Furnace Pot | 5T | 1 | Set |
Furnace frame | 5T | 1 | Set | ||
Hydraulic Cylinder | 5T | 1 | Set | ||
Sensor | 5T | 1 | Set | ||
Crucible | 5T | 1 | Pcs | ||
Insulating mortar | 1 | Set | |||
Water-cooled cable | T2 red copper (2 pcs 1 set) | 1 | set | ||
Cyclone dust cover | XF-5000 | 1 | set | ||
Security Fence | Automatic lifting | 1 | Set | ||
3 | Hydraulic system | Hydraulic station | Excluding hydraulic oil, including high-pressure tubing (Double pumps, one use and one backup) | 1 | Set |
Furnace tilting hydraulic console | Including hydraulic control system | 1 | Set | ||
Furnace leaking alarm system | 1 | Set | |||
4 | enclosed water cooling system | Power supply closed water cooling | HL-1500 | 1 | Set |
Furnace body closed water cooling | HL-3500 | 1 | Set | ||
5 | Installation materials | Stainless steel pipes, valves, brackets, etc. | 1 | batch | |
6 | Transformer | Zp-3150KVA/10kv/0.575kv*2 | 1 | Set | |
7 | Connecting copper bar | Maximum length of one piece is 6 meters | From transfer to power supply | 36 | M |
Converter Cabinet


Capacitor

Hydraulic pumping unit

Control board

Complete steel shell furnace body

Closed water cooled equipment

After sale service:
1.Quality Guarantee: 1 year.
2.Commissioning: We send technicians to the site to provide installation and commissioning services.
3.During the warranty period, provide accessories, free of charge .
4.After the warranty period, provide accessories in time and guide installation and commissioning
Trade terms
1. Delivery Port : Qingdao
2.Lead time: 30 days in low season, 60-90 days in peak season
3.Shipment: 20GP/40GP/40HC/40OT/Flat rack container,According to the situation
4.Payment terms:
4.1)By T/T, 50% in advance , 50% balance before shipment
4.2)By T/T + L/C , 50% by T/T in advance , 50% by 100% irrevocable L/C opened by famous Bank
4.3)By L/C , 100% Confirmed irrevocable L/C opened by famous Bank