Main Steel Frame | Column | Q235, Q355 welded H section steel/ Trusse Section |
Beam | Q235, Q355 welded H section steel/ Trusse Section | |
Secondary Frame | Purlin | Q235, Q355 C and Z purlin |
Knee brace | Q235B Angle Steel | |
Tie Rod | Q235B Circular Steel Pipe | |
Brace | Q235B Round Bar | |
Vertical and Horizontal Support | Q235B Angle Steel, Round Bar or Steel Pipe | |
Maintenance system | Roof Panel | EPS Sandwich Panel / Glass Fiber Sandwich Panel /Rock Wool Sandwich Panel / Pu Sandwich Panel /Steel Sheet |
Wall Panel | Sandwich Panel / Corrugated Steel Sheet | |
Accessories | Window | Aluminium Alloy Window / PVC Window / Sandwich Panel Window |
Door | Sliding Sandwich Panel Door / Rolling Metal Door / Personal Door | |
Rainspout | PVC | |
Finishing Options | Vast array of colors and textures available | |
Paint Options | Zinc rich epoxy painting, one primary painting, two finish painting (gray paint, red paint, white paint, epoxy zinc etc.) Or Galvanized. |
Why choose steel structure buildings?
1. High construction efficiency:
All components are prefabricated in the factory, and the construction site only requires simple assembly, making the construction process relatively safe.
2. Cost savings:
Steel structures are the cost leaders in materials and design for most projects. Its manufacturing and installation costs are low, and it requires less maintenance compared to other traditional building methods.
3. Nice Durability:
Steel structures have good seismic resistance, wind resistance, corrosion resistance, and long service life.
4. Space utilization:
Compared with concrete structures, steel structures can increase the usable area by approximately 6%.
5. Environmentally friendly:
Steel is the material with the highest recycling rate in the world, with an annual recycling capacity of 65 million tons per year, effectively reducing environmental pollution caused by the production of building materials.

Hot Products

In order to meet all customer's needs, we can undertake large stadiums, steel structure buildings, large-span steel plant, workshop, warehouse, dormitory, 4S Motor Hall, steel structure bridges, Cowshed, poultry house, garage and other single storey steel structure projects. We have rich experience in the construction and installation of steel structures. With professional technical force and supporting facilities, we focus on customer satisfaction, provide perfect construction scheme and after-sales service for your project, and realize the integration project of steel structure.
What's the Standard Packing?

1. Packing the pipes into the bundles by the steel strip.
2. Packing the welded steel structure parts by some fabric.
3. Packing the small parts by bags and EPS foam.
4. Packing sets parts by some box.
5. Load into 40ft HQ, 20ft GP or 40OT.
How to quote:
1 | Location (Where will be built?) | _____Country, _____ Area |
2 | Size: length*width*height | _____mm*_____mm*_____mm |
3 | Wind load (max. wind speed) | _____kn/m2, _____km/h, _____m/s |
4 | Snow load (max. snow height) | _____kn/m2, _____mm |
5 | Anti-earthquake | _____Level |
6 | Brickwall needed or not | If yes, 1.2m high or 1.5m high |
7 | Thermal insulation | If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested. If not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former. |
8 | Door quantity & size | _____units, _____(width)mm*_____(height)mm |
9 | Window quanity & size | _____units, _____(width)mm*_____(height)mm |
10 | Crane needed or not | If yes, _____units, max. lifting weight____tons; max. lifting height _____m |


2. Dingrui Yongcheng has domestically advanced intelligent fully automatic new building materials processing and production lines, which can independently complete a series of processes such as steel plate cutting, transmission, assembly, flipping, welding, and correction, truly realizing the fully automatic process of industrialized production and mechanized operations.
In the future, Dingrui Yongcheng will continue to adhere to the principle of "quality first"provide customers with high-quality one-stop solutions with a pioneering and enterprising corporate style, and a pragmatic and efficient corporate spirit.

- Our factory covers an area of over 30000 square meters, with 6 advanced H-beam production lines. which produce more than 3.000 tons of building materials every month.
- Experienced designers, using auto CAD and other professional design software, to provide customers with different design solutions. Can meet the requirements of different customers
- We have the national second level general contracting qualification for housing construction projects, ISO9001.ISO 45001. and ISO 14001 quality system certifications.


A: We are an integrated industry and trade company. You are welcomed to visiting our factory. The quality control flow and sales team will show you our professionalism.
Q: Whats the quality assurance you provided and how do you control quality?
A: There is a procedure to check products at all stages of the manufacturing process -raw materials, in process materials, validated or tested materials,finished goods, etc. SGS, BV and other testing are available for us.
Q: Can you offer designing service?
A: Yes, we have more than 20 experienced designers. We could design full solution drawings as per your requirements. By using Auto CAD, PKPM, MTS3D3S,Tekla Structures (X steel) etc, we can design complex industrial building like office mansion, super market, plants, shipping mall, 5 stars hotel,etc.One-stop service is our outstanding superiority
Q: How about the delivery time?
A: The specific production time depends on the quantity of goods. Normally, it is about 10 to 30 days after all the details are confirmed and receiving the deposit. The delivery of Large order should be discussed with the management department in advance and then confirm the timing with you accordingly.Usually, large order will be delivered in batches.
Q: What about the installation instrucions?
A: We will provide you installation videos and detailed installation instructions or online technical guidance.If you need, we can provide the service of installation guidance arrange a team to do the installation on site by extra.
Q: How about the payment?
A: All payment methods are acceptable. We prefer to 30% down payment by T/T,70% balance before shipment.