MK-0059
Machinery Parts
CNC Machining
Aluminum Alloy
as Drawings
OEM/Oed/Standard
0.5-2mm
Material Inspection Report
Dimension Report
ANSI
CE, ISO 9001:2000
Oxidation
Laser Cutting
Polishing, Machining, Chrome Plated
ISO9001:2008
Fob, CFR or CIF
Plastic Bag + Carton +Pallet
Within 30 Days
OEM
Carton/Pallet
ISO 9001: 2000
Qingdao, China
7616999000
Product Description



Detail

High precision and complex shape: Our permanent casting aluminum process is engineered to create components with exceptional dimensional precision and intricate designs, significantly reducing the need for further processing. The flexibility in mold design allows for the production of parts with delicate details, ensuring every component meets the highest standards.
Excellent surface quality: The casting surface is impeccably smooth, minimizing the need for additional polishing or surface treatments. It supports direct electroplating, spraying, and other surface enhancements, elevating the product's appearance and boosting its resistance to corrosion.


High production efficiency: Our permanent casting process is optimized for mass production, offering rapid single mold formation and exceptional production efficiency. With long-lasting dies, it's ideally suited for prolonged, large-scale manufacturing, ensuring consistency and reliability.
Product Material | Aluminum alloy |
Design software | CAD,solidworks |
Application | Machinery Parts |
Surface treatment | Polishing, Grinding, Anodization,powder coating |
Mould life | 25000-30000shots |
Standard | GB |
Machine | CNC EDM |
Delivery Time | 25-30 Days |













Q1.Is it possible to customize production?
Yes, customized production according to customer requirements is our advantage
Q2.MOQ
According to the customer's needs,
Q3.How to obtain a quotation?
Please provide 2D or 3D drawings and inform us of the material, surface treatment, procurement quantity, etc. We will provide the most cost-effective quotation according to the customer's requirements
Q4.Product production cycle
After determining the product details, the mold will be ready in 25-35 days. Produce samples within 2-3 days.