- Quality stainless steel inner tank, sealed cover
- Microcomputer control
- Safety interlocking device
- With BD test, HELIX test, VACUUM test.
- LCD display and touch buttons.
- With standard test interface
- Open-type top water tank(STB-B8B,STB-B12B)
- Connect the water inlet pipe for automatic water inlet(STB-B18B,STB-B23B)
- European CLASS B standard.
- With automatic protection function: over temperature protection, over pressure protection, low water
- Eevel protection, anti dry burning, and safety door lock.
- Three times pre-vacuum
- Buzzer reminder after sterilization, automatic stop.
- Automatic discharge of cold air, automatic steam exhaust after sterilization.
- Built-in steam generator to provide saturated steam quickly
Model | STB-B8B | STB-B12B | STB-B18B | STB-B23B |
Volume | 8L | 12L | 18L | 23L |
Power | 2kW | 2kW | 2kW | 2kW |
Voltage | AC220/110V,50/60Hz | |||
Design pressure | 0.25MPa | |||
Design temperature | 139ºC | |||
Rated working pressure | 0.22MPa | |||
Rated working temperature | 134ºC | |||
Chamber volume | Ø170*320 | Ø200*355 | Ø250*370 | Ø250*452 |
Outer dimension | 445*580*400 | 445*580*400 | 480*640*450 | 480*690*450 |

Q: How about quality of the goods?
A:
All the running products comply with CE standards.
Independent quality inspection team, conducting multiple inspections and random inspections from parts supply to product dispatch.
Well-known third-party testing service available, such as SGS, BV, and TUV, etc.
Q: What are your pre- and after-sales services?
A:
Timely reply to pre-sales enquiries
Real-time update of manufacturing and shipment status
Contracted third-party maintenance company in over 60 countries
Assured availability of parts supply for 10 years at least
Q: Is OEM service available.
A: Most of the running products are available for OEM customization, including logo, package and function, if attainable, customization.
Q: How long is the lead time:
A: Generally, the lead time for most stocked products is about 7~15 days, vary by models and production schedule. For those non-stocked products, the manufacturing lead time is around 20 days.