Inquiry Cassava Starch Production Line

Price Negotiable Compare
Min Order 1 Set
Shipping From Beijing, China
Popularity 232 people viewed
Quantity
+-
 

Beijing Liretec Starch Technology Co., Ltd

VIP   Audited Supplier 4 years
Profile Certified by SGS/BV
Liretec-A3
Debugging,Repair,Replacement of Parts
1 Year
Making Starch
220V/380V/Other
ISO
Stainless Steel
92%-95%
Cassava Production Line
25 Years
Can Choose Fully Automatic Line or Manual Producti
LIRETEC
Sea Transportation
Strainless Steel
Beijing, China
8438600000
Product Description





 

Advantages

 
1. High Extraction Rate 

Using multi stage hydrocyclones for concentrating, the advanced process design assure the extraction rate more than 92%
2. Low Water Consumption 
It needs 5- 8 tons of water for each ton starch, much less than those traditional equipments which need 15 - 25 tons water.
3. Large in Capacity 
Single Large production line can process 60 tons of potato, 50 tons of sweet potato, or 120 tons of cassava for one hour. 
4. Closed System 
All equipments and tanks are closed, they are connected by pipelines, there is no open device so that it can ensure that the production line has good performance and a clean and hygienic environment.
5. Fully utomated design
It can save time and labor power, meanwhile the quality of the product produced is also guaranteed, such as the online cleaning function, it can make whole production system cleaned completely. 

 

Main Equipments


Technical Parameter

Cassava Starch Production Line TypeCapacity Range (t/h)
Manual or Automatic Line5 to 60 or more

FAQ

Q:Are you a trade company or a manufacturer?
A:We are a manufacturer, and welcome to visit our factory and check the machines.
Q:How long is your delivery time?
A:Generally it is 10days when goods are in stock, or it is 35days if the goods are not in stock. We could discuss before contract.
Q:Could you supply all the parameters about the machines?
A:Yes, We will supply all the parameters, price layout drawing, factory desion etc.
Q:What is your terms of payment?
A:30% T/T in advance , 70% balance before shipment after in spection.
Q:How about the after-service?
A:We will send engineers to the buyer's factory for 7-14 days period installation and training to the operatiors.
Q:Do you supply any formula to buyer?
A:Yes, we supply formulas to buyer.

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA